Indonesia and Chile Propose Green Minerals Partnership to Boost Critical Minerals and Battery Cooperation

Published: Oct 05, 2026 15:47 (GMT+8)
Indonesia and Chile proposed a Green Minerals Partnership to deepen cooperation in copper, aluminium, battery materials, green mining technology and downstream processing, supported by the IC-CEPA.

Indonesia has proposed a Green Minerals Partnership Memorandum of Understanding (MoU) with Chile to strengthen cooperation in the energy and critical minerals sectors, ANTARA reported Monday.

The proposed MoU would cover joint industrial projects, cooperation among mineral-producing countries, green mining technologies, an investment platform and an ocean-based distribution strategy, according to a statement from the Indonesian Embassy in Santiago Indoesian news agency reported. 

Indonesian Deputy Foreign Minister Arif Havas Oegroseno presented the proposal during a bilateral meeting with Chilean Foreign Minister Francisco Pérez Mackenna on the sidelines of the Indonesia-Latin America and the Caribbean Business Mission (INALAC-BM) 2026 in Santiago on October 1. Mackenna welcomed the proposal and said he would follow up on it at the earliest opportunity, ANTARA reported.

The two countries also agreed to prioritize the use of the Indonesia-Chile Comprehensive Economic Partnership Agreement (IC-CEPA) to support cooperation in the battery and vaccine sectors.

In the mining and battery sectors, Havas encouraged cooperation to develop battery and electric vehicle ecosystems involving Chilean state-owned copper producer Corporación Nacional del Cobre (Codelco), PT Freeport Indonesia and Indonesia's state-owned aluminium producer PT Indonesia Asahan Aluminium (INALUM).

Codelco expressed openness to cooperating with Indonesia on research and technology, news agency said. 

Havas also proposed establishing an "Indonesia-Chile Industrial Bridge" in the mining sector involving INALUM, Freeport Indonesia, Codelco and Chilean company Elecmetal. The proposed cooperation would also cover environmentally friendly management and further utilisation of mineral processing waste, including mine tailings.

The initiative could provide a framework for greater cooperation between two major mineral-producing countries, particularly in areas including copper, aluminium, battery materials, mining technology and downstream processing.

Indonesia is seeking to strengthen domestic mineral processing and downstream industries, while Chile remains a major global copper producer. Closer cooperation between companies from the two countries could support investment, technology exchange and the development of integrated mineral and battery supply chains.

The IC-CEPA was signed on December 14, 2017, and entered into force on August 10, 2019. Under the agreement, 6,704 Indonesian products across the agricultural, fishery, manufacturing, mining and industrial sectors qualify for zero-percent import tariffs in Chile.

Bilateral trade between Indonesia and Chile reached $535.51 million, up 12.40% year on year, according to Indonesia's Ministry of Trade data cited by ANTARA.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
London BTC flags copper and antimony at Nevada Black Star
9 mins ago
London BTC flags copper and antimony at Nevada Black Star
Read More
London BTC flags copper and antimony at Nevada Black Star
London BTC flags copper and antimony at Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) announced on 5 October 2026 initial on-site pXRF results from its Black Star gold-critical minerals project in Pershing County, Nevada. A maiden programme collected 69 rock-chip samples along a 2.5km corridor between the Western and Eastern targets. pXRF readings showed antimony up to 0.44% Sb, copper up to 30.0% Cu, bismuth up to 0.73% Bi and silver up to 811 ppm Ag, with the antimony-copper association appearing at both ends of the corridor. The signature mirrors a historical 1985 sample 120m south of the claims (>1% Sb, 2% Cu, 700 ppm Ag). Earlier due-diligence sampling returned up to 16.23 g/t gold and 50.5 g/t silver. Samples are now with MSALABS for laboratory assays, with full multi-element geochemistry including antimony, tungsten and copper to follow. Copper, as a by-product credit, adds strategic appeal under US critical-minerals policy, though results remain preliminary field readings.
9 mins ago
Kantra extends Nugent copper-gold lode 70m below resource
10 mins ago
Kantra extends Nugent copper-gold lode 70m below resource
Read More
Kantra extends Nugent copper-gold lode 70m below resource
Kantra extends Nugent copper-gold lode 70m below resource
Kantra Copper Limited (ASX:KAN) reported underground diamond drilling at its Kanmantoo copper mine in South Australia that extends the Nugent lode 70m below the 2025 Mineral Resource Estimate and 370m beneath the current 950 Level stopping horizon. Hole 26KVUG0949 returned 70m at 1.18% copper and 0.24g/t gold from 507m, including 38m at 1.46% copper and 0.18g/t gold. Nugent, on the deposit's south-western edge, carries generally higher gold grades. By end-August 2026 the company had completed 38,535m of underground diamond drilling, including 12,024m at Nugent, and expects a resource update incorporating about 80,000m of drilling in late October. Kanmantoo is an operating mine that produced 3,170t of copper in the June 2026 quarter; 2026 guidance is 12,750-14,000t of copper, and the deep extension offers low-capital growth from existing infrastructure.
10 mins ago
Freeport Reports Q3 Copper Production of 830 Million lb as Grasberg Recovery Advances
41 mins ago
Freeport Reports Q3 Copper Production of 830 Million lb as Grasberg Recovery Advances
Read More
Freeport Reports Q3 Copper Production of 830 Million lb as Grasberg Recovery Advances
Freeport Reports Q3 Copper Production of 830 Million lb as Grasberg Recovery Advances
Freeport-McMoRan reported third-quarter 2026 consolidated copper production of approximately 830 million lb, equivalent to about 376,500 mt, broadly in line with expectations as the company continued the phased recovery of operations at the Grasberg minerals district in Indonesia.​ Freeport said slightly stronger results from its international operations offset somewhat lower production from its U.S. mines. Third-quarter copper sales are expected to approximate the company’s July estimate of 750 million lb.​ At Grasberg, mill throughput averaged approximately 140,000 mt of ore per day during the quarter, equivalent to around 67% of normalized operating rates before the September 2025 incident. About 70,000 mt/day of the total throughput came from the Grasberg Block Cave underground mine.​ Upgrades to the Block Cave material-handling system remain on track for completion in early 2027, while preparations continue for the targeted restart of Production Block 1S by mid-2027. Freeport continues to expect Grasberg to reach approximately 80% of capacity by mid-2027 and approach full capacity by the end of 2027.​ PT Freeport Indonesia’s Eastern Java smelter, which had been temporarily suspended following the September 2025 Grasberg incident, restarted operations in late August 2026. Freeport said the smelter ramp-up is progressing in line with expectations. PTFI’s combined smelting capacity, including PT Smelting, is capable of producing up to approximately 800,000 mt/year of copper cathode.​ Freeport also said its U.S. operations experienced lower-than-planned operating rates during the third quarter due to localized flooding, power outages and strong winds, while unusually dry conditions in Indonesia created some milling challenges with limited impact to date.​ Freeport’s third-quarter production performance indicates that the Grasberg recovery is progressing broadly in line with the company’s expectations, although the operation remains below pre-incident throughput levels. The gradual ramp-up at both the Grasberg Block Cave and the Eastern Java smelter should support improving copper output and downstream processing capacity over the coming quarters. Attention will remain on completion of the material-handling upgrades, the planned restart of Production Block 1S and Freeport’s ability to reach 80% of Grasberg capacity by mid-2027.
41 mins ago