SMM & MIRU.com Partnership - Past and Future Developments

Published: Feb 09, 2022 15:43 (GMT+8)
Source: SMM
In October 2021, SMM entered into a partnership with MIRU.com, a leading metal resources provider in Japan, and kicked off the cooperation.

SHANGHAI, Feb 9 (SMM) - In October 2021, SMM entered into a partnership with MIRU.com, a leading metal resources provider in Japan, and kicked off the cooperation. Various efforts have been made so far, particularly at the Battery Summit 2022 held on January 14, 2022, Mr. Antares Yuan, an analyst in the SMM battery and new energy division, participated in the summit via video and through his participation, information on China was told to the meeting attendants. This effort is a major step forward in the partnership between SMM and MIRU.com.

We have summarised the efforts so far between SMM and MIRU.com.

● SMM invited MIRU.com to participate in the 2021 SMM NONFERROUS METALS INDUSTRY CHAIN ​​ANNUAL CONFERENCE held in Shanghai, China from November 10th to 12th, 2021 as the only media support in Japan

MIRU.com attended all conferences of this three-day annual conference online and distributed a total of 21 articles with topics concerning copper, aluminum, lead, zinc, and new energy.

● The 1st MIRU & SMM Online Live "2022 World Economy, Iron and Non-Ferrous Metal Market Outlook" was held on December 3, 2021 (Friday). The online live accommodated over 100 participants. Along with the video provided by SMM, an online question and answer session was also held.

● In December 2021, the partnership was further strengthened and cooperation related to research work was deepened. As a result, SMM will be capable of providing in-depth information from a global perspective.

● SMM participated in the Battery Summit 2022 held by MIRU.com with Professor Akira Yoshino of Asahi Kasei as the main speaker on January 14. At the summit, SMM new energy analyst, Mr. Antares Yuan, gave a 15-minute video presentation in English under the theme of "China New Energy Vehicle and Power Battery Industry Development and Review".  It was well received by meeting attendees that they had a good understanding of the EV and battery markets in China.

● SMM will host the 7th China International New Energy Conference 2022 in Chengdu, China  on April 20 – 22, 2022. Topics regarding new energy batteries and their materials, power battery recycling, new energy industry equipment and technology, and international new energy industry chain will be covered during the summit. We sincerely invite you to join the conference.

SMM is glad to announce that we have invited the Chairman and CEO of MIRU.com to give a speech on Japan's battery policy and development of recycling. 

We would like to continue such efforts both online and offline.

● SMM holds online seminars in English on a regular basis, and will invite MIRU.com to participate as a media partner each time with follow-up media coverage.

● SMM has invited MIRU.com participate in the SMM seminars in the future.

In this way, SMM and MIRU.com have been sharing various information in the past three months since the start of the partnership. In the future, we plan to strengthen information sharing on both sides and to further strengthen the cooperation.

----------------------------------------

<Who is MIRU.com>

-    MIRU.com provides information on a wide range of topics, such as upstream resources, downstream products, scrap recycling, cutting-edge electronic materials and semiconductor market trends

-    MIRU.com English Version launched in 2017

-    As of 2022, around 4,000 Subscribers (Domestic 9 : 1 International)

-    Subscribers mainly consist of major corporations and are from extensive industries such as steel manufacturers, nonferrous metal smelting manufacturers, automobile manufacturers, home appliance manufacturers, major trading companies and recycling companies

-    Running MIRU PLUS since 2020

-    Regularly held online or in-person covering topics like automobile, battery and recycling sectors

-    Various types of research for major corporations, universities and research institutions

Based on a contract with each company, tailored information specifically for them can be provided

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Flash | Antofagasta's Centinela Faces Strike Threat Over Labor Dispute]
1 hour ago
[Flash | Antofagasta's Centinela Faces Strike Threat Over Labor Dispute]
Read More
[Flash | Antofagasta's Centinela Faces Strike Threat Over Labor Dispute]
[Flash | Antofagasta's Centinela Faces Strike Threat Over Labor Dispute]
Recently, Centinela, a core Antofagasta mine, faced severe labor challenges. On September 28, its Minera Esperanza and Distrito Centinela unions voted 98.73% in favor of a strike over compensation discrepancies, rejecting management's contract offer. As an important associated molybdenum source, Centinela's H1 2026 molybdenum output fell ~17.6% year-on-year to 1,400 tonnes. The strike vote threatens further supply stability. While production continues pending mediation results, the potential impact on operations and long-term project progress requires close monitoring.
1 hour ago
【Flash | Feedstock Scarcity Nearly Halves Kazakhstan Processor’s Molybdenum Output】
3 hours ago
【Flash | Feedstock Scarcity Nearly Halves Kazakhstan Processor’s Molybdenum Output】
Read More
【Flash | Feedstock Scarcity Nearly Halves Kazakhstan Processor’s Molybdenum Output】
【Flash | Feedstock Scarcity Nearly Halves Kazakhstan Processor’s Molybdenum Output】
Ferro-Alloy Resources reported that ferromolybdenum produced at its Balasausqandiq plant contained 14.6 tonnes of molybdenum in H1 2026, down 47.5% from 27.8 tonnes a year earlier. The figure represents contained molybdenum, not the gross weight of ferromolybdenum; the company did not disclose the alloy grade or total product tonnage. Raw-material throughput fell 35% because suitable, economically processable purchased concentrates were unavailable, while revenue declined 28% to $1.8 million. Feedstock constraints reduced output, although the plant’s absolute tonnage remains small.
3 hours ago
[SMM Analysis] Low-Carbon of Primary Copper Begin Trading Separately—Will Recycled Copper’s Green Value Be Reassessed?
4 hours ago
[SMM Analysis] Low-Carbon of Primary Copper Begin Trading Separately—Will Recycled Copper’s Green Value Be Reassessed?
Read More
[SMM Analysis] Low-Carbon of Primary Copper Begin Trading Separately—Will Recycled Copper’s Green Value Be Reassessed?
[SMM Analysis] Low-Carbon of Primary Copper Begin Trading Separately—Will Recycled Copper’s Green Value Be Reassessed?
[SMM Analysis: Low-Carbon of Primary Copper Begin Trading Separately—Will Recycled Copper’s Green Value Be Reassessed?] BHP and Amazon’s EAC pilot separates verified emissions reductions from physical copper trade, giving low-emissions primary copper a new source of environmental value. Recycled copper retains a major energy advantage, but future competitiveness may depend more on traceability, recycled content and verified carbon data, potentially adding an environmental dimension to pricing.
4 hours ago