SHANGHAI, Dec 6 (SMM) – China Copper Southeast Copper produced more than 46,000 mt of copper anode in November, the highest since the commissioning of the project. In the first 11 months of this year, the cumulative output of copper cathodes was 383,000 mt, exceeding the planned schedule. It is expected that the output target of 400,000 mt will be achieved ahead of schedule by mid-December.

![Macro Pressure Combined with Supply-Demand Divergence, BC Copper Fluctuated Intraday and Closed Down 2.35% [SMM BC Copper Commentary]](https://imgqn.smm.cn/usercenter/vcsIC20251217171710.jpg)


