Zijin Mining Put Timok Copper-Gold Mine into Production

게시됨: Oct 25, 2021 16:25
The official commissioning ceremony of Zijin Mining’s Timok copper-gold mine was held on October 22 in Boll, where the project is located.

SHANGHAI, Oct 25 (SMM) - The official commissioning ceremony of Zijin Mining’s Timok copper-gold mine was held on October 22 in Boll, where the project is located.

Serbian President Vucic pointed out that Zijin Mining's newly-built Timok copper-gold mine, with an investment of $474 million, will become the first green mine in Serbia, which means that modern technology will be used in the ore mining process to meet the highest standards in the field of environmental protection.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
Zijin Mining Put Timok Copper-Gold Mine into Production - Shanghai Metals Market (SMM)