Operating Rates of Secondary Lead Smelters Up 2.98 Percentage Points on Week

Published: Jul 30, 2021 17:15
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 64.45% in the week ended July 30, up 2.98 percentage points from the previous week, showed an SMM survey.

SHANGHAI, Jul 30 (SMM) – Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 64.45% in the week ended July 30, up 2.98 percentage points from the previous week, showed an SMM survey.

Anhui Dadao’s production increased after partly resuming operation from the maintenance, and Henan Jinli basically resumed production after the power curtailment, bringing the major increment to the production.

Besides the sample companies, Tongliao Taiding in Inner Mongolia and Xincheng Power in Henan suspended production for lack of raw materials this week.

Anhui Dadao is expected to fully resume production, and Huoqilin in Guizhou is expected to recover production next week. The overall operating rate is likely to rise further next week.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
31 mins ago
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Read More
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Contango Silver & Gold announced that it had completed the camp-to-proposed-portal road, bridges and portal pad at its Johnson Tract polymetallic project in Alaska. Geotechnical drilling along the proposed coastal access road and barge facility easements has also been completed. Most environmental and cultural baseline studies are substantially complete, while permitting for the coastal road and barge facilities remains underway. The JT deposit has an existing indicated resource of 3.489 million tonnes grading 5.21% zinc and 0.67% lead, containing 400.8 million lb of zinc and 51.5 million lb of lead, alongside gold, silver and copper. The resource estimate has an effective date of July 12, 2022. The completed works prepare the site for subsequent underground exploration and feasibility studies. The project is not in production, and the completed road covers the camp-to-proposed-portal section.
31 mins ago
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
1 hour ago
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Read More
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Kingfisher Mining has reported lead-zinc-silver drilling results from its Stephens Trig and Allendale prospects near Broken Hill, Australia. The first drilling at Stephens Trig since 2017 comprised five holes totaling 584 m. Results included 5 m at 7.4% combined lead and zinc and 10 g/t silver from 79 m downhole, including 2 m at 17.5% lead-zinc and 24 g/t silver. A separate interval returned 1 m at 198 g/t silver from 111 m. At Allendale, nine holes totaling 802 m returned 9 m at 8.05% lead-zinc and 17.9 g/t silver from 64 m, including 5 m at 10.37% lead-zinc and 23.2 g/t silver. Both prospects remain at the exploration stage.
1 hour ago
[SHFE lead morning news] SHFE and LME pace slightly diverged, SHFE lead bucked the trend and shot up, closing with a long upper shadow
4 hours ago
[SHFE lead morning news] SHFE and LME pace slightly diverged, SHFE lead bucked the trend and shot up, closing with a long upper shadow
Read More
[SHFE lead morning news] SHFE and LME pace slightly diverged, SHFE lead bucked the trend and shot up, closing with a long upper shadow
[SHFE lead morning news] SHFE and LME pace slightly diverged, SHFE lead bucked the trend and shot up, closing with a long upper shadow
4 hours ago