Silicon social inventory dropped to a new low in 4 years

Published: Jun 04, 2021 18:01 (GMT+8)
According to SMM's statistics, social inventories of silicon in Huangp port, Kunming, and Tianjin port totalled 27,000 mt as of June 4, a decrease of 5,000 mt from the previous week.

SHANGHAI, Jun 4 (SMM) - According to SMM's statistics, social inventories of silicon in Huangp port, Kunming, and Tianjin port totalled 27,000 mt as of June 4, a decrease of 5,000 mt from the previous week.

The social inventories in Kunming fell to a record low in nearly four years as most silicon plants in Yunnan were halted due to power rationing. Although some silicon plants in Sichuan, Hunan, and Guangxi have increased production, the worsened pandemic in Guangdong impeded the transportation, and the arrivals at Huangpu port declined. However, the inventory at Huangpu port stood stable amid lower exports at the beginning of June. Silicon social inventory is likely to further decline as the production in Yunnan is yet to resume.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
13 hours ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Read More
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Chile’s National Geology and Mining Service ordered a temporary halt on October 13 at El Teniente’s North Crater waste dump and other areas exposed to avalanche or ground-movement risks, while stating that the order does not suspend the entire division. Amerigo Resources separately said its Minera Valle Central tailings operation was unaffected. El Teniente produced 1,483.1 metric tonnes of contained molybdenum in the first half of 2026, down 34.9% from a year earlier. No disruption to underground mining, concentrators or the molybdenum recovery circuit has been confirmed; SMM is not revising its forecast.
13 hours ago
[SMM Chromium Flash] Tharisa’s Average Chrome Price Slips to $285/t in Q4 as FY2027 Guidance Holds at 1.50-1.65 Mt
14 hours ago
[SMM Chromium Flash] Tharisa’s Average Chrome Price Slips to $285/t in Q4 as FY2027 Guidance Holds at 1.50-1.65 Mt
Read More
[SMM Chromium Flash] Tharisa’s Average Chrome Price Slips to $285/t in Q4 as FY2027 Guidance Holds at 1.50-1.65 Mt
[SMM Chromium Flash] Tharisa’s Average Chrome Price Slips to $285/t in Q4 as FY2027 Guidance Holds at 1.50-1.65 Mt
Tharisa reported an average metallurgical-grade chrome concentrate price of US$285/t on a 42% basis in the fourth quarter of its 2026 financial year, down 6.9% from US$306/t in the third quarter. The FY2026 average was US$290/t, up 9.0% from US$266/t in FY2025. CEO Phoevos Pouroulis said the pricing environment was materially stronger than in the prior year. The PGM basket moved in the same direction. The average PGM contained-metal basket price was US$2,535/oz in the fourth quarter, down 5.4% from US$2,681/oz in the third quarter. The FY2026 average was US$2,607/oz, against US$1,615/oz in FY2025. For FY2027, Tharisa guided chrome concentrate production of 1.50-1.65 Mt and PGM production of 150,000-170,000 oz on a 6E basis, reflecting production from the Tharisa Mine only. The chrome range is unchanged from FY2026 guidance, and FY2026 output of 1.56 Mt fell within it.
14 hours ago
[SMM Chromium Flash] Tharisa’s FY2026 Chrome Concentrate Output Reaches 1.56 Mt, in Line With Guidance
14 hours ago
[SMM Chromium Flash] Tharisa’s FY2026 Chrome Concentrate Output Reaches 1.56 Mt, in Line With Guidance
Read More
[SMM Chromium Flash] Tharisa’s FY2026 Chrome Concentrate Output Reaches 1.56 Mt, in Line With Guidance
[SMM Chromium Flash] Tharisa’s FY2026 Chrome Concentrate Output Reaches 1.56 Mt, in Line With Guidance
Tharisa produced 416,700 mt of chrome concentrate in the fourth quarter of its 2026 financial year (July-September), up 5.8% quarter-on-quarter from 393,800 mt in the third quarter. The quarter’s output comprised 371,300 mt of metallurgical grade and 45,400 mt of specialty grades. Full-year FY2026 production came to 1,563,800 mt, marginally above the 1,558,200 mt produced in FY2025 and in line with the company’s guidance. Higher throughput supported the quarterly gain. At the Tharisa Mine in South Africa, reef mined increased 8.5% quarter-on-quarter to 1.34 million mt, while reef milled rose 7.3% to 1.43 million mt. The company’s PGM output rose alongside chrome, with quarterly production of 41,000 oz on a 6E basis, bringing the FY2026 total to 153,700 oz. Tharisa CEO Phoevos Pouroulis said the group met its market guidance for both commodities in FY2026, describing it as the year the company’s growth moved from planning into construction.
14 hours ago