Secondary lead smelters operating rates rose on production resumption at smelters

Published: Mar 05, 2021 17:01 (GMT+8)
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 56.5% in the week ended March 5, up 7.3 percentage points from the previous week, showed an SMM survey.

SHANGHAI, Mar 5 (SMM) – Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 56.5% in the week ended March 5, up 7.3 percentage points from the previous week, showed an SMM survey.

The average operating rate remained unchanged on the week at 69.5% in Anhui.

Henan Jinli ramped up production after CNY, and Huarui recovered to operate at full capacity this week, which lifted local average operating rate by 21.7 percentage points to 77.2%.

The average operating rate in Jiangsu gained 28 percentage points week on week to 46.7%, as New Chunxin stepped up production after procurements of battery scrap recovered.

Guizhou Sanhe, Dingxin and Jinlong were all required to suspend production on concerns of environmental protection, which reduced local operating rate by 10.5 percentage points to 2.4%.

Secondary lead operating rates are expected to be stable or rise slightly next week.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
4 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
4 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
8 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Read More
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile Metals announced that its second rig had arrived at Tribag–West Wedge in New Brunswick, Canada, with drilling expected to begin at Tribag in the coming days. Seven modelled electromagnetic targets are associated with the Tribag lead-zinc and West Wedge copper-lead-zinc occurrences. Wedge drilling continues in parallel. By September 21, the company had completed 18 holes totaling 4,934.50 metres of its 10,000-metre annual program. The conductors remain geophysical targets requiring drilling to establish their source.
8 hours ago
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Oct 01, 2026 10:06 (GMT+8)
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Read More
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Masivo Silver reported assays from CC-26-001, its first hole at Cerro Colorado in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres averaging 0.271% zinc, 0.141% lead and 7.0 g/t silver. Technical difficulties ended drilling at 259.5 metres while the hole remained within mineralized rock.
Oct 01, 2026 10:06 (GMT+8)
Secondary lead smelters operating rates rose on production resumption at smelters - Shanghai Metals Market (SMM)