Secondary lead smelters operating rates dropped 1.3% this week

Published: Jan 29, 2021 16:11 (GMT+8)
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

SHANGHAI, Jan 29 (SMM) — Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

The average operating rates remained unchanged on the week at 47.1%, 70.2%, and 33.3% in Anhui, Henan and Jiangsu respectively.

The operating rate in Guizhou dropped 7.3 percentage points on the week to 37.8%, mainly due to Yongxin’s production suspension for holiday.

The alert for the heavy air pollution in Henan was lifted this week. Xincheng Power, Jinhui and other smelters resumed production, but Hebei Shichang and Henan Jiayi suspended production for holidays. Guizhou Dingxin and Cenxiang will enter the holiday next week, and Guizhou Huoqilin will also stop the refining production line. The operating rates are expected to drop further next week.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
2 mins ago
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Read More
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
2 mins ago
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
10 mins ago
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Read More
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Masivo Silver reported assays from CC-26-001, the first hole of its 2026 drilling program at the Cerro Colorado project in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres grading 0.271% zinc, 0.141% lead, 7.0 g/t silver, 0.025% copper and 0.010 g/t gold. A separate 5.10-metre interval from 215.10 metres graded 0.611% zinc, 0.121% lead and 24.0 g/t silver. The hole was terminated at 259.5 metres because of technical drilling difficulties while still within altered and mineralised rock. Masivo plans to integrate the assays with geological, structural, alteration and geophysical information to guide follow-up drilling testing lateral and vertical continuity. The company states that all reported intervals are drilled lengths and true widths have not yet been determined.
10 mins ago
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
16 mins ago
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
Read More
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
5N Plus plans to expand its St. George, Utah facility by approximately 50%, with completion targeted for H2 2027. The site transforms indium antimonide and other specialty materials into semiconductor materials, wafers, substrates and selected components, with recovery, purification and crystal-growth capabilities. New equipment will be installed progressively, but InSb-specific capacity was not disclosed; the 50% figure refers to the facility expansion, not indium demand.
16 mins ago