Benchmark RC for imported copper anode was set at $145/mt cif in 2021 long-term contracts

Published: Jan 13, 2021 16:44
Jiangxi Copper and Chambishi, a Zambian blister copper producer under China Nonferrous Metal Mining Group, set the benchmark refining charge (RC) for imported copper anode at $145/mt cif, in their 2021 long-term contracts, rising significantly from the $128/mt in 2020, which indicates market expectations of ample blister copper supply in the future.

SHANGHAI, Jan 13 (SMM)—Jiangxi Copper and Chambishi, a Zambian blister copper producer under China Nonferrous Metal Mining Group, set the benchmark refining charge (RC) for imported copper anode at $145/mt cif, in their 2021 long-term contracts, rising significantly from the $128/mt in 2020, which indicates market expectations of ample blister copper supply in the future.

In the domestic spot market, RCs for domestic blister copper mainly stood between 1,450-1,550 yuan/mt(delivery to factory) in December, with the average RC up 25 yuan/mt on the month, while RCs for imported copper anode stood at $155-165/mt cif, with the average figure up $2.5/mt month on month. Overseas high-quality copper scrap flowed into the domestic market after the secondary copper resources policy took effect, driving some domestic low-quality copper scrap to smelters. SMM learned that RC for domestic blister copper was set at about 1,500 yuan/mt in long-term contracts in 2021. Imports of copper anode stood at 117,700 mt in November, recording a new high. Ample blister copper stocks at domestic smelters kept RCs at high levels.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Fed Officials Publicly Clash Over Next Steps in Monetary Policy Amid Inflation Concerns
3 hours ago
Fed Officials Publicly Clash Over Next Steps in Monetary Policy Amid Inflation Concerns
Read More
Fed Officials Publicly Clash Over Next Steps in Monetary Policy Amid Inflation Concerns
Fed Officials Publicly Clash Over Next Steps in Monetary Policy Amid Inflation Concerns
Divisions within the US Fed over the next direction of monetary policy have become increasingly public. Richmond Fed President Barkin on Thursday laid out the case for keeping interest rates unchanged, while warning of persistent inflation risks; Cleveland Fed President Hammack again reiterated her call for rate hikes, extending the dissent she voiced at the July policy meeting.
3 hours ago
Jilongshan Gold Mining Launches 4-Month Reserve Verification Project, Aiming to Add 2.4M mt Ore & 2t Gold
3 hours ago
Jilongshan Gold Mining Launches 4-Month Reserve Verification Project, Aiming to Add 2.4M mt Ore & 2t Gold
Read More
Jilongshan Gold Mining Launches 4-Month Reserve Verification Project, Aiming to Add 2.4M mt Ore & 2t Gold
Jilongshan Gold Mining Launches 4-Month Reserve Verification Project, Aiming to Add 2.4M mt Ore & 2t Gold
The reserve verification exploration project of Hubei Jilongshan Gold Mining Co., Ltd. broke ground, marking the project’s official shift from planning, decision-making, and design validation to the substantive construction stage. This exploration program will last four months, with the core drilling work planned to complete 32 drill holes totaling 11,000 m of footage within two months. According to preliminary estimates, the project is expected to add 2.4 million mt of ore, 2 mt of gold metal content, and 4,500 mt of copper metal content.
3 hours ago
Codelco's El Teniente Copper Mine Project to Resume, Targeting 2029 Production Amid Seismic Risks
3 hours ago
Codelco's El Teniente Copper Mine Project to Resume, Targeting 2029 Production Amid Seismic Risks
Read More
Codelco's El Teniente Copper Mine Project to Resume, Targeting 2029 Production Amid Seismic Risks
Codelco's El Teniente Copper Mine Project to Resume, Targeting 2029 Production Amid Seismic Risks
Codelco executive Gustavo Reyes said the company's stalled El Teniente copper mine project is expected to begin production in 2029.On August 4, Codelco said it had suspended the project, which aims to develop the Andes Norte area of the vast underground mine. Earlier, the latest studies showed that the mine faced higher seismic risk than initially expected.
3 hours ago
Benchmark RC for imported copper anode was set at $145/mt cif in 2021 long-term contracts - Shanghai Metals Market (SMM)