SMM Evening Comments (Jan 7): Nonferrous metals on the SHFE mostly advanced, nickel jumped 2.9%

Published: Jan 7, 2021 18:50
SHFE nonferrous metals rose for the most part on Thursday January 7. Nickel, the best performer, jumped 2.9% to lead the gains, zinc advanced 1.77%, lead rose 1.33%, copper gained 1.04% and tin added 0.25%, while aluminium shed 0.49%.

SHANGHAI, Jan 7 (SMM) – SHFE nonferrous metals rose for the most part on Thursday January 7. Nickel, the best performer, jumped 2.9% to lead the gains, zinc advanced 1.77%, lead rose 1.33%, copper gained 1.04% and tin added 0.25%, while aluminium shed 0.49%. 

SMM data showed that stocks of 6063 aluminium billet across the five major consumption areas – Foshan, Wuxi, Huzhou, Changzhou and Nanchang – in China expanded 14,900 from the prior week to 85,700 mt as of January 7. Stocks were stable in Wuxi, but built up in the other four areas, with Guangdong seeing the largest increase in aluminium billet stocks which increased 9,100 mt on the week to 41,600 mt. Stocks expanded 3,200 mt to 10,000 mt in Nanchang, while rose slightly by 1,600 mt and 1,000 mt in Changzhou and Huzhou respectively.

Social inventories of primary aluminium across eight consumption areas in China, including SHFE warrants, roes 51,000 mt from the prior week to 664,000 mt as of January 7. Rising arrivals of imported primary aluminium ingots and those from Xinjiang and Qinghai contributed to the rise in inventories.

Copper: The most-traded SHFE 2102 copper contract rose 1.04% to finish the day at 59,380 yuan/mt, with open interest decreasing 2,024 lots to 95,867 lots.     

Congress early Thursday morning confirmed the election of Joe Biden as president, a day after a mob invaded the Capitol in a chaotic effort to avoid having President Donald Trump be formally recognized as the loser in the race. The 10-year U.S. Treasury yield continued its ascent above the 1% mark on Thursday morning, following a projected win for the Democrats of two Senate seats in the Georgia runoff elections. Private sector employment fell in December as consumer and business activity in some states was affected by lockdowns to combat the coronavirus pandemic which has worsened across much of the country. Employers in the private sector shed 123,000 jobs in December – the first decline since April, according to the ADP National Employment Report reported Wednesday. The US dollar index, which tracks the greenback against leading currencies, hovered around 89.5, providing support to copper prices.  

US first-time filings for unemployment benefits in the week ended January 2 set for release tonight will be monitored.

Zinc: The most-liquid SHFE 2102 zinc contract ended the day 1.77% higher at 21,620 yuan/mt after hitting a one week high at 21,700 yuan/mt earlier in the session, with open interest decreasing 765 lots to 72,925 lots. Output cuts at zinc smelters missed expectations, and consumption continued to weak. Zinc smelters in north China will start the Chinese New Year holiday from mid-January.

Lead: The most-liquid SHFE 2102 lead contract rose 1.33% to close the day at a nearly one-month high of 15,230 yuan/mt, with trading volume rising 7,159 lots to 62,558 lots. Several lead-acid battery producers suspended production due to a resurgence of COVID-19 cases in Hebei province, which pressured SHFE lead, but expectations of pre-holiday stockpiling provided support to lead prices. Pressure from the 15,200 yuan/mt mark will be monitored tonight. 

Tin: The most-traded SHFE 2103 tin contract added 0.25% to end the day at 158,650 yuan/mt, with open interest rising 1,490 lots to 41,961 lots. It is expected to move between 155,000-160,000 yuan/mt tonight.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
6 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
6 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
22 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
22 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
22 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
22 hours ago
SMM Evening Comments (Jan 7): Nonferrous metals on the SHFE mostly advanced, nickel jumped 2.9% - Shanghai Metals Market (SMM)