SMM Evening Comments (Dec 15): Shanghai nonferrous metals ended mixed, lead fell 2.02%

Published: Dec 15, 2020 18:00 (GMT+8)
SHFE nonferrous metals closed mixed on Tuesday December 15 as concerns over a coronavirus surge in multiple countries dulled optimism over the vaccine rollout in the US.

SHANGHAI, Dec 15 (SMM) – SHFE nonferrous metals closed mixed on Tuesday December 15 as concerns over a coronavirus surge in multiple countries dulled optimism over the vaccine rollout in the US.

China’s industrial production grew 7% year-on-year in November, the country’s National Bureau of Statistics announced Tuesday.

Nickel, the best performer, rose 0.67%, tin advanced 0.42%, copper and zinc remained unchanged, while aluminium edged down 0.28%, and lead weakened 2.02%.

The ferrous complex rose across the board. Iron ore advanced 1.48%, rebar rose 1.17%, and hot-rolled coil climbed 0.6%.

Copper: The most-traded SHFE 2101 copper contract remained unchanged at 57,710 yuan/mt. Open interest fell 5,352 lots to 93,000 lots.

The pandemic continued to bring pessimism. The death toll in COVID-19 exceeded 300,000. The mayor of New York warned to prepare for a comprehensive blockade. In addition, London implemented the strictest pandemic prevention restrictions on Wednesday. It is widely expected that the Federal Reserve will provide new guidelines for the bond purchase program this week. Members from both parties have announced the details of the two-part $908 billion anti- pandemic relief program, and the anti- pandemic relief bill may be incorporated into it. Short-and medium-term monetary easing stimulus is still beneficial to the capital market.

The People's Bank of China (PBOC) is expected to put MLF funds into the net for the fifth consecutive month to escort the liquidity of the New Year. China's industrial and retail data released today are in line with expectations, and both are accelerating growth. Among them, the annual rate of China's total retail sales of consumer goods in November stood at 5%, and the annual rate of China's industrial added value above the designated size stood at 7%, both of which increased month on month, supporting copper prices to some extent.

The guidance of LME copper, US industrial production for November and whether the contract could move above five-day moving average will come under scrutiny tonight.

Aluminium: The most-liquid SHFE 2101 aluminium contract finished the day 0.28% lower at 16,230 yuan/mt. Open interest fell 5,081 lots to 118,752 lots. Operating rates at aluminium extrusion producers rose slightly from October at 63.10% in November. Operating rates at industrial extrusion producers rose 2.98 percentage points from October to 69.68%, and fell slightly to 61.84% at construction extrusion producers.

Zinc: The most-active SHFE 2101 zinc contract remained unchanged at 21,455 yuan/mt. Open interest fell 4,874 lots to 75,167 lots. On the fundamentals, TCs of zinc ore remained stable month on month, while the zinc ingot stocks remained low. The support from ten- and twenty-day moving average will be monitored in the near term. The contract is expected to keep fluctuating tonight.

Nickel: The most-traded SHFE 2102 nickel contract ended the day 0.96% higher at 131,480 yuan/mt today. Open interest rose 3,088 lots to 177,687 lots. Prices of medium-grade nickel ore remained at $75/wmt in November. Shipments from the Philippines, sold over the previous periods, declined sharply amid the rainy season and cargoes in the spot market thinned.

Lead: The most-traded SHFE 2101 lead contract ended the day 2.02% lower at 14,565 yuan/mt. Open interest rose 2,333 lots to 34,803 lots. Operating rates of the licensed secondary lead smelters in November stood at 55.11%, down 1.82% from October, SMM survey showed. Total capacity in the survey sample which included 34 producers stood at 4.61 million mt/year.

Tin: The most-liquid SHFE 2102 tin contract climbed to a session high of 153,770 yuan/mt and finished the day 0.42% higher at 151,560 yuan/mt today. Open interest fell 170 lots to 31,457 lots.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
7 hours ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
7 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
8 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
8 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
8 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
8 hours ago