Land approval for the project of environmental pollution prevention and comprehensive recovery and utilization of low copper waste rock in Wushan Wunugetushan Copper-Molybdenum Mine

Published: Sep 25, 2020 13:25

SMM: on Sept. 4, China Gold Group Inner Mongolia Mining Co., Ltd. (hereinafter known as "Wushan") formally obtained the approval of the people's Government of Inner Mongolia Autonomous region for the project land for environmental pollution prevention and comprehensive recycling of resources from low copper waste rocks in Wunugetushan Copper-Molybdenum Mine, and agreed to the planning land for the project.

At the present stage, the project of environmental pollution prevention and comprehensive recovery and utilization of low copper waste rock in Wunugetushan Copper-Molybdenum Mine has made a breakthrough. The acquisition of land approval is the core element and pre-condition of the project, and it is also an important node of the preliminary work of the project. The pre-project staff take the environmental impact assessment, various land use procedures and ecological protection as the focus of the pre-project formalities, and have special personnel to dock with government staff, actively coordinate and follow up the progress. finally, we successfully obtained the land document approval from the people's Government of Inner Mongolia Autonomous region. After obtaining the approval of the land, the project is expected to start at the end of 2020 and will be completed and put into production by the end of 2021, taking environmental protection as the general tone of the project construction, so as to maximize the eco-environmental benefits for the company.

It is understood that the project of environmental pollution prevention and comprehensive recovery and utilization of low copper waste rock in Wunugetushan Copper-Molybdenum Mine has been listed as a major ecological civilization construction project of the Development and Reform Commission of Inner Mongolia Autonomous region, and has been paid close attention to and highly recognized by the resident government. In the next step, Wushan will continue to actively communicate with various government functional departments, cooperate closely, fulfill the approval and implementation procedures in accordance with the law, comprehensively and orderly promote the progress of the project, and lay a solid foundation for the follow-up construction work.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
18 hours ago
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
Read More
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis: The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product]
18 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
19 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
Read More
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
19 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
19 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Read More
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Recently, the 500 kV transmission and transformation project of Jiri (Kusha II) was officially approved by the Energy Bureau of Inner Mongolia Autonomous Region, marking a good start for the power grid construction of Ordos City in the first year of the 14th Five-Year Plan. The project is located in the territory of Hangjin Banner, with a total investment of 1.52554 billion yuan. It is a key hub project to ensure the output and consumption of new energy power in the northwestern region of Hangjin Banner. The project plans to build one 500 kV substation and about 194 km of 500 k V lines, which will pass through Hangjin Banner and Dalad Banner.
19 hours ago
Land approval for the project of environmental pollution prevention and comprehensive recovery and utilization of low copper waste rock in Wushan Wunugetushan Copper-Molybdenum Mine - Shanghai Metals Market (SMM)