Home / Metal News / 19 photovoltaic projects 1.25GW! Qianxinan Prefecture Energy Bureau on the start of 2020 photovoltaic power generation project filing notice

19 photovoltaic projects 1.25GW! Qianxinan Prefecture Energy Bureau on the start of 2020 photovoltaic power generation project filing notice

iconSep 10, 2020 17:06
Source:SMM
[19 photovoltaic projects 1.25GW! Qianxinan Prefecture Energy Bureau on starting 2020 Photovoltaic Power Generation Project filing notice] according to Qianxinan Prefecture Energy Bureau, Qianxinan Prefecture organizes 19 photovoltaic projects with a total installed capacity of 1.25 million kilowatts, all of which are included in the national subsidy list.

SMM News: according to Qianxinan Prefecture Energy Bureau learned that Qianxinan Prefecture organization declared 19 photovoltaic projects, a total installed capacity of 1.25 million kilowatts, all into the national subsidy catalogue.

The original text is as follows:

Each county (city) engineering bureau and Yilong economic development bureau:

On June 23, 2020, the General Department of the National Energy Administration issued the notice on announcing the results of national subsidy bidding for photovoltaic projects in 2020. Our state organized 19 photovoltaic projects with a total installed capacity of 1.25 million kilowatts, all of which entered the national subsidy catalogue.

In order to ensure the smooth start of the construction of the project, the competent energy departments at the county level are requested to supervise and guide the project owners in accordance with the relevant requirements of document No. 17 issued by National Energy (2020). Conscientiously implement the conditions of project construction funds, construction land, land transfer of photovoltaic fields, and Electroweb consumption, put an end to all illegal occupation of sensitive areas such as basic farmland, woodland and ecological red lines, and actively strengthen communication and docking with the Provincial Energy Bureau. Do a good job in the preparation of the project record, start the relevant procedures, so as to start early and connect to the network early.

"Click to sign up: 2020 Tin Industry chain Trading Summit

Scan the code to participate in the meeting or apply to join the SMM tin industry exchange group

Photovoltaic
policy
Electroweb
production capacity

For queries, please contact Michael Jiang at michaeljiang@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news

SMM Events & Webinars

All