The fine management project of Hailiang Co., Ltd. was officially launched.

Published: Sep 10, 2020 09:54 (GMT+8)

SMM News: in order to improve the company's fine management level, on September 1st, Zhejiang Hailiang Co., Ltd. launched the fine management project to be held in the company headquarters, set up a fine management team, focusing on the company's fine management project. Zhu Zhangquan, chairman and general manager of Hailiang shares, and Wang Sheng, deputy general manager of Hailiang shares, attended the meeting, while the general managers of various business departments, responsible persons of relevant departments, and responsible persons of finance attended the meeting on the spot or by video connection. Chen Dong, Chief Financial Officer of Hailiang shares, presided over the meeting.

Sun Hongjun, assistant general manager of Hailiang Co., Ltd. made a detailed interpretation of the fine management project planning of Hailiang shares, introduced the division of labor of various departments, and explained the key contents of project management at the same time. It is emphasized that management is a discipline about practical behavior, and effectiveness can only be achieved through practice.

Jiang Lirong, general manager of the Copper Pipeline Division of Hailiang Co., Ltd., as the project leader of the Copper Pipeline Division, the leading unit of the project demonstration, said on behalf of the team that he would respond positively to the company's call to practice fine management with action, and strive to set up an excellent demonstration benchmark.

Zhu Zhangquan shared the theme of "applying big data to improve fine management" at the meeting. He analyzed in detail the differences between the company's financial data and actual data, as well as the problems reflected from the two aspects of quality cost and inventory control, emphasized the importance of fine management, and further clarified the necessity of fine management through the analysis and judgment of the current external competitive environment. He pointed out that he hoped that the management at all levels of the company would attach great importance to this fine management project, fully coordinate the provision of various resources, and complete the standard-setting work with high quality; he hoped that after the demonstration benchmark was set up in the Zhejiang base, all bases would be covered and promoted; it is hoped that the achievement of systematic standard-setting work can effectively promote the company's fine management and lead the company's high-quality development.

"Click to sign up: 2020 Fifth China Electrotechnical Materials supply and demand Trade Summit

Scan the code to participate in the meeting or apply to join the SMM Electrical Industry Exchange Group

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Vedanta Eyes $2.3B Copper Expansion, Tuticorin Smelter Restart
4 hours ago
Vedanta Eyes $2.3B Copper Expansion, Tuticorin Smelter Restart
Read More
Vedanta Eyes $2.3B Copper Expansion, Tuticorin Smelter Restart
Vedanta Eyes $2.3B Copper Expansion, Tuticorin Smelter Restart
Vedanta Copper targets 1 million tonnes/year of copper production across India and Saudi Arabia by the end of the decade, with a proposed Tuticorin smelter restart central to its domestic expansion plans.
4 hours ago
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
6 hours ago
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
Read More
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
EraNova Metals filed an NI 43-101 PEA technical report for its 100%-owned Adanac molybdenum project in Canada. The report confirms the August 6 results without material differences. The proposed 30,000-tpd operation has a 24-year mine life and targets average annual molybdenum output of 11.4 million lb (about 5,171 tonnes), with 270.1 million lb (about 122,515 tonnes) of payable molybdenum over the mine life. Initial capital is estimated at C$953.3 million. EraNova plans to initiate a feasibility study and advance environmental assessment and permitting. The PEA remains preliminary, with no final investment decision or production schedule.
6 hours ago
【Flash | Malmbjerg Field Work Advances Detailed Engineering and Procurement】
7 hours ago
【Flash | Malmbjerg Field Work Advances Detailed Engineering and Procurement】
Read More
【Flash | Malmbjerg Field Work Advances Detailed Engineering and Procurement】
【Flash | Malmbjerg Field Work Advances Detailed Engineering and Procurement】
Greenland Resources completed its expanded summer field program at the Malmbjerg molybdenum project. Work covered infrastructure surveys, glacier investigations, RopeCon optimisation and geotechnical inspections. The team also collected 8 tonnes of drill core and 14 tonnes of saline and fresh water for government-supported metallurgical pilot testing. Results will support detailed engineering, key-equipment procurement and construction contracts. On a 100% basis, the feasibility study targets average output of 32.8 million lb (about 14,878 tonnes) of contained molybdenum annually during the first ten years. This remains planned capacity; no final investment or construction decision was announced.
7 hours ago