【Flash | Malmbjerg Field Work Advances Detailed Engineering and Procurement】

Published: Oct 07, 2026 09:40 (GMT+8)
Greenland Resources completed its expanded summer field program at the Malmbjerg molybdenum project. Work covered infrastructure surveys, glacier investigations, RopeCon optimisation and geotechnical inspections. The team also collected 8 tonnes of drill core and 14 tonnes of saline and fresh water for government-supported metallurgical pilot testing. Results will support detailed engineering, key-equipment procurement and construction contracts. On a 100% basis, the feasibility study targets average output of 32.8 million lb (about 14,878 tonnes) of contained molybdenum annually during the first ten years. This remains planned capacity; no final investment or construction decision was announced.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
48 mins ago
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
Read More
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
Northcliff Resources filed an updated feasibility study for the Sisson tungsten-molybdenum project in New Brunswick, Canada. On a 100% project basis, reserves total 276.8 million tonnes grading 0.023% molybdenum. The 30,000-tpd project targets average annual output of 4.2 million lb (about 1,905 tonnes) of contained molybdenum over a 27-year mine life. Initial capex is C$1.528 billion. A construction decision is targeted for H2 2027 and operations for 2030. Key environmental approvals are in place, but engineering, financing, offtake and remaining EIA conditions are still outstanding. The project represents potential long-term supply rather than current output.
48 mins ago
[SMM Analysis] Rubaya: Ownership, Conflict and the Global Tantalum Trade
13 hours ago
[SMM Analysis] Rubaya: Ownership, Conflict and the Global Tantalum Trade
Read More
[SMM Analysis] Rubaya: Ownership, Conflict and the Global Tantalum Trade
[SMM Analysis] Rubaya: Ownership, Conflict and the Global Tantalum Trade
Rubaya’s coltan industry shows how mineral wealth can sustain livelihoods while under conflict. This study traces the mining district’s ownership, formalisation efforts and M23’s takeover, then examines trade routes, taxation and risks facing miners. Rubaya matters to global tantalum supply, but its precise contribution is subject to further research.
13 hours ago
[SMM Chromium Flash] Zimbabwe's Mines Ministry Inspects Alluvial Chrome Operations in Nationwide Compliance Sweep
18 hours ago
[SMM Chromium Flash] Zimbabwe's Mines Ministry Inspects Alluvial Chrome Operations in Nationwide Compliance Sweep
Read More
[SMM Chromium Flash] Zimbabwe's Mines Ministry Inspects Alluvial Chrome Operations in Nationwide Compliance Sweep
[SMM Chromium Flash] Zimbabwe's Mines Ministry Inspects Alluvial Chrome Operations in Nationwide Compliance Sweep
Zimbabwe's Ministry of Mines and Mining Development has launched nationwide blitz inspections of alluvial chrome mining operations and processing plants, effective September 25, 2026, to enforce compliance with the country's mining laws. The inspections are initially targeting operations in Mashonaland Central, Mashonaland West and Midlands provinces, before being extended to other parts of the country. Permanent Secretary in the Ministry of Mines and Mining Development Dr Thomas Utete Wushe said the exercise is aimed at ensuring chrome mining activities are conducted within the legal framework. The ministry cited Section 222 of the Mines and Minerals Act [Chapter 21:05], which classifies chromite as a designated mineral, and Section 225, which requires anyone seeking to work an alluvial or eluvial chromite deposit to obtain an order from the Mining Affairs Board. Dr Wushe warned that mining operations found in breach of the regulations could face suspension and other penalties, and said the inspections will also cover chrome processing plants to assess compliance with relevant regulatory requirements. The government has appealed to members of the public to assist authorities by reporting suspected illegal alluvial chrome mining activities. The inspections come amid wider efforts by Zimbabwean authorities to regulate mining activities and ensure mineral resources are extracted and processed in accordance with the law, following earlier findings that the country's chrome output fell sharply in the first quarter of 2026 as more accessible alluvial deposits became depleted, pushing producers toward costlier hard-rock extraction methods.
18 hours ago