The total transaction price of two plots in Shijingshan and Pinggu in Beijing was 8.306 billion.

Published: Sep 3, 2020 08:25
Source: Viewpoint real estate network

SMM: on Sept. 2, the Beijing Land Exchange Market publicly listed and sold two parcels of land. Finally, China Shijingshan Real Estate won the land in Shijingshan District, and Beijing Urban Construction won the Pinggu District, all of which were sold at the rock bottom price, with a total price of 8.306 billion yuan. Only one real estate company applied for the two plots, and there was no bidding.

According to the transfer notice, the whole storage and hanging (stone) [2020] lot of Beijing land, that is, the land development project 1608-658 in area B of Beixin'an shantytown, Shijingshan District, Beijing, the nature of the land is second-class residential land, other types of multi-functional land, and child care land, with a transfer area of 73900 square meters, a planned construction area of 267200 square meters, with a starting price of 697.8 million yuan and a starting floor price of 26900 / square meters. Among them, commercial housing construction area of 110000 square meters, unlimited price; commercial land construction area of 155000 square meters.

Beijing soil whole storage hanging (flat) [2020] lot 036, that is, Wangxinzhuang Town, Pinggu District, Beijing (No. 2 Land Phase III) PG00-0002-6006, the nature of the land is R2 Class II residential land, with a transfer area of 36500 square meters and a planned construction area of 85700 square meters, with a starting price of 1.328 billion yuan and a starting floor price of 15500 / square meters. there is no limit to the price of commercial housing.

Scan the QR code and apply to join the SMM real estate industry exchange group

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
8 hours ago
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Read More
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Data released by the Kazakhstan Bureau of Statistics showed that Kazakhstan's copper cathode production in January-February 2026 fell 9.1% YoY.Copper Cathode: February 2026 production was 35,625 mt, down 7.8% MoM; total production in January-February was 74,266 mt, down 9.1% YoY.
8 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
8 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
Read More
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources (000923) announced on March 17 that the Limpopo Province of South Africa, where its subsidiary Palabora Copper (Pty) Ltd. is located, and the neighboring Mpumalanga Province had been hit by the most severe flooding disaster since 2000. As runoff from the open pit and surrounding catchment areas surged into the company’s mine workings, some tunnels in Phase I and Phase II of the copper project were flooded, causing some critical facilities to be submerged (with no casualties). As the operating area of Copper Phase II is located at a deeper level, dewatering has progressed relatively slowly, and dewatering operations are still underway, with completion expected in early April.
8 hours ago
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
8 hours ago
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
Read More
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
Kevin Hassett, Director of the White House National Economic Council in the US, said that oil tankers had "already begun to pass sporadically" through the Strait of Hormuz, and that if necessary, the scale of a globally coordinated release of strategic petroleum reserves could be expanded. Speaking on CNBC, he said the White House had formulated response plans for every stage of supply chain disruptions, and said he was "very confident that the current situation is under control and will end soon."
8 hours ago
The total transaction price of two plots in Shijingshan and Pinggu in Beijing was 8.306 billion. - Shanghai Metals Market (SMM)