Chihong zinc and germanium realize time task "double more than half"

Published: Jul 15, 2020 16:10 (GMT+8)
Source: China Nonferrous Metals Daily

SMM News: as of June 30, Yunnan Chihong Zinc Germanium Co., Ltd. lead concentrate lead metal content, zinc concentrate zinc metal content, electric lead, electric zinc, germanium products containing germanium, silver and other products output have exceeded the plan, the smooth realization of the time task "double more than half".

At the beginning of 2020, the sudden outbreak of new crown pneumonia tested Chihong's ability and level of production and management of zinc and germanium. Under the strong leadership of China Copper Industry Co., Ltd., Chihong Zinc and Germanium resolutely implemented the decision and deployment of the China Copper Party Committee, grasped the prevention and control of the epidemic on the one hand, and always put the life safety and health of employees in the first place, so that there was no collective infection in the workplace; grasp business development on the one hand, stick to business performance goals unswervingly, and achieve "two-handed grasp, no mistakes".

During the extraordinary period, Chihong zinc and germanium actively resolved the difficulties of production organization, logistics and transportation brought by the epidemic, overcame the unfavorable factors such as shortage of manpower, market downturn, poor product transportation, and so on, by dynamically tracking customers' return to work nodes and demands. protect materials, grasp orders, increase the coordination of production, supply and marketing, and maintain the overall balance of purchase, production and marketing; Seize the market opportunity of germanium infrared thermal imaging thermometer, actively and quickly launch a fully automatic body temperature screening system, which increases the market share of the company's germanium lenses; orderly organize Yiliang Chihong water control project, Chihong comprehensive utilization of lead system transformation project to meet standards and other projects to achieve production according to the node, and realize the lead system project to turn losses into profits in May. Deepen cost alignment, strengthen cost reduction control and tapping potential, exceed schedule to achieve cost reduction targets; all the company's production enterprises in the war "epidemic" in the production, flags do not fall, "1 minute did not stop production." The output of lead, zinc and germanium products exceeded the schedule by 8.89%, 3.59% and 46.88%, respectively.

Chihong zinc and germanium also actively assisted the local government in fighting the epidemic, donated a total of 7.5 million yuan to the government and the public, donated thermometers, masks, disinfectants, and other epidemic prevention materials worth more than 1 million yuan, and actively assumed social responsibility. it has achieved "two-handed grasp and excellent performance" in epidemic prevention production, which has been widely praised by the local government, the media and the public.

In the next step, Chihong Zinc and Germanium will continue to study and implement the advanced concepts of Chinalco and China Copper, implement various requirements, face up to shortcomings, catch up with the advanced, actively take the lead, and accelerate the transformation of ideas, ways of thinking, working methods and work style. adhere to self-improvement, self-development, self-transcendence, constantly adjust posture, adapt to changing situations, turn adversity into opportunities, and go against the trend. To make due contribution to the construction of the world's most competitive world-class copper-lead-zinc enterprises.

Scan the QR code and join the SMM metal communication group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)