Tangshan’s air pollution control draft plan in June

Published: May 29, 2020 15:05
A draft plan of air quality control in Tangshan in June was announced. Steelmakers that are graded as A and B on their environmental status will continue to be exempted from production restrictions in June

SHANGHAI, May 29 (SMM) – A draft plan for air quality cotrol in Tangshan was released on Friday May 29, which indicates that steelmakers that are graded A and B on their environmental status will continue to be exempted from production restrictions in June.

 

The curbs on grade C steel mills will vary. Ganglu, Jinxi’s eastern and western plants, Wenfeng, Tanggang Medium & Heavy Plate, Delong are required to cut capacity of their sintering and pelletising machines and blast furnaces by at least 20%, while the cut is expanded to at least 30% for Donghai, Jiujiang Wire, Xinda, Yanshan, Rongxin, Songting and Zhayi, and to at least 50% for Chunxing, Tanggang Stainless, Donghai Special, Guoyi, Jinma, Donghua, Kaiheng, Ruifeng and Jing’an, according to the draft plan which has yet to be approved by the city’s environmental authorities.

 

Tanggang is allowed to run its 360 m2 sintering machine in its southern plant at 50% of capacity, while two sintering machines and a 3,200 m3 blast furnace in its northern plant are also allowed to maintain operation. The steelmaker is ordered to halt the rest of its blast furnaces and sintering machines.

 

Tangyin is required to suspend all blast furnaces and sintering machines but 180 m2 sintering machine, 550 m2 and 1,080 m2 blast furnaces.

 

Tianzhu, Xinbaotai, Huaxi, Rongcheng and Jianlong, meanwhile, are required to curb capacity of their sintering machines.

 

For re-rollers, excluding cold-rolling mills, those who are graded as “bad” in the Technical Guide for Differentiated Management and Control Measures in Some Industries in Tangshan are required to suspend production if they are located in Lubei, Gaoxin, Kaiping, Guye, Fengrun, Fengnan and Luanzhou; otherwise, such re-rollers shall reduce production by at least 50%.

 

Production restrictions will also be imposed on coke plants, brick-tile kilns, lime kilns, foundries, grinderies and cement plants in Tangshan in June.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
15 hours ago
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Read More
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Recently, Inner Mongolia Shuangli Mining Co., Ltd. (hereinafter referred to as "Shuangli Mining") held the completion and trial production ceremony for the upgrading and capacity expansion project of the mining and beneficiation system at the No. 2 Iron Mine in the Geqi mining area.Once the project reaches full production, it will produce 870,000 mt of iron ore concentrates, 9,580 mt of copper concentrates, 5,432 mt of lead concentrates, and 2,052 mt of zinc concentrates annually, injecting new momentum into Shuangli Mining's green and high-quality development.
15 hours ago
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Mar 24, 2026 17:21
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Read More
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
[Molybdenum-Iron Tender Information] SMM, March 24: It is reported that on March 23, a special steel group in east China announced the tender price for a new round of ferromolybdenum procurement, with the tax-inclusive plant-delivered acceptance-settled price at 277,500 yuan/mt, down 2,000 yuan/mt from the tender price on March 18. The public tender purchase volume was 120 mt (bid volume), while the actual total purchase volume remained to be determined.
Mar 24, 2026 17:21
[SMM Hot-Rolled Coil Daily Transactions] Spot Transactions Weakened Somewhat
Mar 18, 2026 16:56
[SMM Hot-Rolled Coil Daily Transactions] Spot Transactions Weakened Somewhat
Read More
[SMM Hot-Rolled Coil Daily Transactions] Spot Transactions Weakened Somewhat
[SMM Hot-Rolled Coil Daily Transactions] Spot Transactions Weakened Somewhat
[SMM Daily Hot-Rolled Coil Trading] On March 18, the total daily trading volume of hot-rolled coil among SMM sample enterprises in four cities (Shanghai, Lecong, Tianjin, and Ningbo) was 14,430 mt, down 640 mt day on day, or 4.2%, with up 14.43% YoY on a calendar basis and down 26.56% YoY on a lunar calendar basis.
Mar 18, 2026 16:56