Ningbo Xusheng Auto to kick off construction of 10 million units/year auto part base in July

Published: May 25, 2020 10:38
Shanghai-listed Ningbo Xusheng Auto Technology plans to invest 1.92 billion yuan into the construction of an intelligent automation production plant, designed with an annualised capacity of 10 million light-weight aluminium alloy auto parts, the company said on May 22.

SHANGHAI, May 25 (SMM) – Shanghai-listed Ningbo Xusheng Auto Technology plans to invest 1.92 billion yuan into the construction of an intelligent automation production plant, designed with an annualised capacity of 10 million light-weight aluminium alloy auto parts, the company said on May 22. 


The project, adapting to the development of new energy vehicles and lightweight market, will be equipped with automatic production lines for die casting, extrusion, and machining. Process technologies such as smelting, die casting, extrusion and machining will be adopted. 


Construction of the project is slated to begin in July, with completion expected in June 2023.   

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
8 hours ago
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
Read More
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
[SMM Aluminum Express News] Metro Mining (ASX:MMI) resumed operations at Bauxite Hills in mid-March after Tropical Cyclone Narelle caused minimal disruption, with only seven days of lost production and no infrastructure damage. The Port of Skardon reopened on 25 March, with barging gradually returning to full capacity by mid-April. Despite the disruption, 100,000 WMT was shipped in March. Transhipping continues via TSA Skardon Floating Crane and ultramax vessels, while the Ikamba Offshore Floating Terminal is en route back from maintenance in Batam and expected to arrive end-April. Full-year 2026 shipments are forecast at 6.6–7.1 million WMT.
8 hours ago
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
8 hours ago
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
Read More
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
[SMM Express] SHFE data showed that on April 7, the total registered cast aluminum alloy warrants stood at 31,183 mt, a decrease of 453 mt from the previous trading day. Specifically, the total registered volume in Shanghai was 1,912 mt (down 30 mt), Guangdong 12,358 mt (down 121 mt), Jiangsu 3,602 mt (down 30 mt), Zhejiang 8,471 mt (down 272 mt), Chongqing 3,634 mt (unchanged), and Sichuan 1,206 mt (unchanged).
8 hours ago
Data: SHFE, DCE market movement (Apr 07)
10 hours ago
Data: SHFE, DCE market movement (Apr 07)
Read More
Data: SHFE, DCE market movement (Apr 07)
Data: SHFE, DCE market movement (Apr 07)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 07 Apr , 2026
10 hours ago