[SMM survey] the sustained climbing rate of lead concentrate production rose to 40.6% in April.

Published: May 12, 2020 18:02 (GMT+8)

SMM, 12 May:

According to the SMM (SMM) survey, the operating rate of lead concentrate was 40.6% in April, up 6.5% from the previous month. The survey involved 86 enterprises with a production capacity of 767000 tons.

According to SMM investigation and understanding, in April, the operating rate of lead concentrate continued to climb, the impact of the epidemic on domestic production enterprises basically receded, mining enterprises resumed production one after another, and the contribution of lead concentrate increased month by month. According to the scale of mining enterprises, the specific reasons are as follows:

The operating rate of large mining enterprises with an annual capacity of more than 10,000 tons is 35.5%, with little fluctuation on a month-on-month basis. Among them, Xinjiang Zijin is short of raw ore, output is declining, Guizhou Hongqiao is only mined and not selected, and there is little output. At the same time, Chifeng Baiyinnuer overhaul has been completed, Sichuan Qiansheng Mining Industry and Inner Mongolia Yulong Mining Industry have resumed production, offset by increases and decreases, the total output of lead mine recorded a small increase.

The operating rate of medium-sized mining enterprises with an annual production capacity of 0.51000 tons increased by 19% to 46.6% month-on-month, mainly due to the resumption of production after maintenance in Rongda mining industry in Inner Mongolia and the improvement of lead taste in Fozichong mine in Guangxi. As a result, the output of lead concentrate has been increased.

The operating rate of small mining enterprises with an annual capacity of less than 5000 tons rose 20.9% to 65.6% month-on-month, mainly due to the seasonal suspension of production in the northern high-altitude areas, the impact of the pre-superimposed epidemic situation faded, and mining companies in Inner Mongolia and other places successively resumed production, such as Senxin Mining in Genhe City.

To sum up, lead concentrate production continued to rise in April. Looking forward to May, the seasonal shutdown in high latitudes is basically nearing the end, the peak production season of mining enterprises is approaching, coupled with a small decline in processing fees, it is expected that the start-up rate in May may maintain the upward trend.

"Click to sign up for SMM" 2020 (15th) lead and Zinc Summit

The QR code in the scan picture applies to enter the SMM lead industry exchange group and receives the SMM lead industry newsletter every day.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Oct 02, 2026 10:38 (GMT+8)
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Read More
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile Metals announced that its second rig had arrived at Tribag–West Wedge in New Brunswick, Canada, with drilling expected to begin at Tribag in the coming days. Seven modelled electromagnetic targets are associated with the Tribag lead-zinc and West Wedge copper-lead-zinc occurrences. Wedge drilling continues in parallel. By September 21, the company had completed 18 holes totaling 4,934.50 metres of its 10,000-metre annual program. The conductors remain geophysical targets requiring drilling to establish their source.
Oct 02, 2026 10:38 (GMT+8)
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Oct 01, 2026 10:06 (GMT+8)
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Read More
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Masivo Silver reported assays from CC-26-001, its first hole at Cerro Colorado in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres averaging 0.271% zinc, 0.141% lead and 7.0 g/t silver. Technical difficulties ended drilling at 259.5 metres while the hole remained within mineralized rock.
Oct 01, 2026 10:06 (GMT+8)