China’s installed power battery capacity rallied 30% in April

Published: May 12, 2020 11:49
China's installed capacity of batteries to power electric vehicles climbed 29.5% from a month ago to 3.6GWh in April, following a surge of 363.2% in the month of March, showed data from the China Automobile Power Battery Industry Innovation Alliance, suggesting the country’s EV sector continues to recover from the fallout caused by the coronavirus pandemic.

SHANGHAI, May 12 (SMM) – China's installed capacity of batteries to power electric vehicles climbed 29.5% from a month ago to 3.6GWh in April, following a surge of 363.2% in the month of March, showed data from the China Automobile Power Battery Industry Innovation Alliance, suggesting the country’s EV sector continues to recover from the fallout caused by the coronavirus pandemic. 


On a yearly basis, the installed capacity of power batteries was 33.7% lower in April, but the decline narrowed from a 45.6% drop in March. 


In the first four months of the year, China's installed capacity of batteries to power EVs amounted to 9.3GWh, down 47.7% from the same period last year. 


Separately, data published by the Innovation Alliance showed that China produced about 4.7GWh power batteries in April, 5.5% higher on the month while 35.5% lower on the year. 


Domestic power battery production in January-April decreased 52.1% year on year to 13GWh. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Indonesia's State Electricity Company (PLN) Increases Purchase of Tsingshan IWIP Waste Heat Power to 11 Megawatts, Aiming to Strengthen Regional Power Grid Stability
14 hours ago
[SMM News] Indonesia's State Electricity Company (PLN) Increases Purchase of Tsingshan IWIP Waste Heat Power to 11 Megawatts, Aiming to Strengthen Regional Power Grid Stability
Read More
[SMM News] Indonesia's State Electricity Company (PLN) Increases Purchase of Tsingshan IWIP Waste Heat Power to 11 Megawatts, Aiming to Strengthen Regional Power Grid Stability
[SMM News] Indonesia's State Electricity Company (PLN) Increases Purchase of Tsingshan IWIP Waste Heat Power to 11 Megawatts, Aiming to Strengthen Regional Power Grid Stability
Indonesia's state power company (PLN) Maluku and North Maluku branch officially revised the power purchase agreement with Weda Bay Industrial Park (IWIP) on March 2, 2026, increasing the purchased excess power from 8.5 MW to 11 MW. PLN General Manager Noer Soeratmoko stated that the additional 2.5 MW capacity aims to address the growing electricity demand of residents and small enterprises in the central Halmahera region, ensuring the stability of the central Halmahera power grid during peak periods. IWIP President He Xiaoqing (Kevin He) noted that this collaboration is a significant step for the industrial park in supporting local energy supply, and by enhancing cooperation with PLN, it can rapidly improve regional power security without the need to construct new power plants.
14 hours ago
【SMM Flash News】PLN Increases Excess Power Purchase from IWIP to 11 MW to Boost Regional Grid Stability
14 hours ago
【SMM Flash News】PLN Increases Excess Power Purchase from IWIP to 11 MW to Boost Regional Grid Stability
Read More
【SMM Flash News】PLN Increases Excess Power Purchase from IWIP to 11 MW to Boost Regional Grid Stability
【SMM Flash News】PLN Increases Excess Power Purchase from IWIP to 11 MW to Boost Regional Grid Stability
PT PLN (Persero) has officially amended its Power Purchase Agreement (PJBTL) with PT Indonesia Weda Bay Industrial Park (IWIP), increasing the utilization of excess power from 8.5 MW to 11 MW as of March 2, 2026. General Manager Noer Soeratmoko stated that this 2.5 MW increase is a strategic move to secure power reserves for the Weda system amid rising demand from households and local businesses in Central Halmahera. IWIP President Director Kevin He emphasized that this collaboration ensures high-quality power distribution for the community, providing an immediate energy solution without the need for new power plant construction.
14 hours ago
[SMM Analysis] Global Stainless Steel Market Review – February 2026: Policy Shocks Collide with Supply Disruptions
16 hours ago
[SMM Analysis] Global Stainless Steel Market Review – February 2026: Policy Shocks Collide with Supply Disruptions
Read More
[SMM Analysis] Global Stainless Steel Market Review – February 2026: Policy Shocks Collide with Supply Disruptions
[SMM Analysis] Global Stainless Steel Market Review – February 2026: Policy Shocks Collide with Supply Disruptions
16 hours ago