SMM Evening Comments (Oct 25)

Published: Oct 25, 2019 18:39
SHFE nonferrous metals, except for aluminium and zinc, closed higher on Friday

SHANGHAI, Oct 25 (SMM) – SHFE nonferrous metals, except for aluminium and zinc, closed higher on Friday. Nickel led the increases with a 1.1% gain, lead advanced 0.5%, tin and copper rose 0.2%.

The ferrous complex, except for stainless steel, drifted higher. Iron ore was the best performer with a gain of 2.1%. Coke and rebar climbed 1.2%, hot-rolled coil increased by 0.8%, and coking coal was up 0.3%.

Copper: The most active SHFE 1912 contract recovered from earlier losses during the daytime session, as the US dollar weakened in the afternoon as weak US economic data spurred expectations for another interest rate cut by the Fed later this month. SHFE copper closed 0.17% higher at 47,390 yuan/mt, after hitting a new five-week high of 47,570 yuan/mt overnight. With a green MACD bar, whether SHFE copper could remain above 47,300 yuan/mt will come under scrutiny tonight.  

Aluminium: The most traded SHFE 1912 contract dropped to an intraday low of 13,775 yuan/mt during the day, before it recouped some losses to end a tad weaker at 13,805 yuan/mt. It is expected to remain rangebound tonight, supported by falling inventories but weighed by prospects for weaker consumption in the long term.

Zinc: The most active SHFE 1912 contract dropped to a two-week low of 18,655 yuan/mt, as shorts loaded up positions after SMM data showed that zinc social inventories inched up this week. It closed the trading day 0.95% lower at 18,675 yuan/mt. A stronger LME zinc and recent positive macro developments will limit downside in SHFE zinc, which is expected to move rangebound in the short term. The contract is likely to test support at the lower Bollinger band tonight.

Nickel: The most traded SHFE 1912 contract hovered in a tight range around the daily moving average at 133,200 yuan/mt during the daytime session, holding onto overnight gains to close 1.13% higher at 133,340 yuan/mt. Three consecutive days of gains have sent SHFE nickel above several moving averages, and the contract now faces a resistance area around the 20-day moving average and the 134,000 yuan/mt handle.

Lead: The most active SHFE 1912 contract rallied from an intraday low of 16,605 yuan/mt to an intraday high of 16,785 yuan/mt during the day session, pointing to strong support at 16,600 yuan/mt. It ended the day 0.54% higher at 16,750 yuan/mt, clawing back some losses from earlier this week. SHFE lead is expected to extend its rally tonight, tracking gains in its LME counterpart, but upside will be limited by resistance at moving averages.

Tin: The most traded SHFE 2001 contract recovered from initial losses during the daytime session to end up 0.18% at 138,200 yuan/mt. SHFE tin is expected to continue its rangebound pattern in the short term, with support at 137,000 yuan/mt and resistance at 140,000 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
12 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
12 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
15 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
15 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
15 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
15 hours ago