The Langlois zinc mine owned by Nyrstar will stop production in December. Last year, zinc concentrate production reached 24000 tons.

Published: Oct 15, 2019 08:58 (GMT+8)
Nyrstar announced on Monday that its Langlois zinc mine would stop production in December, mainly because local rock conditions had deteriorated and were no longer suitable for mining operations. In 2018, the zinc concentrate output of the Langlois project reached 24000 tons.

SMM10, March 15: Nyrstar announced Monday that its Langlois zinc mine will stop production in December, mainly because local rock conditions have deteriorated and are no longer suitable for mining operations.

In 2018, the zinc concentrate output of the Langlois project reached 24000 tons.

The Langlois zinc mine began production in July 2007, but maintenance began the following year.

Nyrstar acquired the project in 2011 and brought the mine back to operation through the renovation of underground mines and surface infrastructure.

"Click to sign up for the 2019 China Zinc oxide Industry chain Trading Summit"

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
MMG Q3 2026 Zinc Production Down 5% YoY, Rosebery Mine Output Slumps
4 hours ago
MMG Q3 2026 Zinc Production Down 5% YoY, Rosebery Mine Output Slumps
Read More
MMG Q3 2026 Zinc Production Down 5% YoY, Rosebery Mine Output Slumps
MMG Q3 2026 Zinc Production Down 5% YoY, Rosebery Mine Output Slumps
MMG released its third-quarter 2026 production report on October 14. Total zinc production for the quarter reached 55.9kt, down 5% YoY, mainly due to lower output at the Rosebery mine. Dugald River produced 47.8kt of zinc in zinc concentrate during the quarter, broadly unchanged YoY. The mine remains on track to achieve the upper end of its full-year zinc production guidance of 170–180kt. Rosebery produced 8.13kt of zinc during the quarter, down 23% YoY, primarily due to reduced ore supply following seismic events in the X-South orebody area since July. As a result, the company lowered its 2026 zinc production guidance for the mine to 32–37kt from the previous 45–55kt.
4 hours ago
Secondary Zinc Oxide Prices Remain Elevated Amid Market Stalemate in Q3[SMM Analysis]
5 hours ago
Secondary Zinc Oxide Prices Remain Elevated Amid Market Stalemate in Q3[SMM Analysis]
Read More
Secondary Zinc Oxide Prices Remain Elevated Amid Market Stalemate in Q3[SMM Analysis]
Secondary Zinc Oxide Prices Remain Elevated Amid Market Stalemate in Q3[SMM Analysis]
In Q3, Secondary Zinc Oxide prices remained elevated amid a tug-of-war between raw material cost support and weak downstream demand. Tight steel ash supply pushed up raw material costs, while downstream buyers showed limited acceptance of high-priced material, restricting further price increases. How will Secondary Zinc Oxide prices perform in Q4?
5 hours ago
Data: SHFE, DCE market movement (Oct 14)
6 hours ago
Data: SHFE, DCE market movement (Oct 14)
Read More
Data: SHFE, DCE market movement (Oct 14)
Data: SHFE, DCE market movement (Oct 14)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 14 Oct , 2026
6 hours ago