Report: Lithium battery cathode project commissions in Shandong

Published: Jul 11, 2019 12:45
It is designed with a capacity of 5,000 mt/year of LFP materials and 5,000 mt/year of iron phosphate as by-products

SHANGHAI, Jul 11 (SMM) – Shandong Xindongneng Lithium Power Technology, a producer of power battery materials under Shandong Lubei Enterprise Group, commissioned the first stage of its lithium iron phosphate (LFP) cathode materials project on Monday July 8, local media reported. 

With an investment of 200 million yuan, the project is designed with a total capacity of 5,000 mt/year of LFP materials and 5,000 mt/year of iron phosphate as by-products. 

The company's other project, with a capacity of 30,000 mt/year LFP cathode materials and 30,000 mt/year iron phosphate is still in the pipeline. It involves an investment of 1.22 billion yuan. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
 [SMM Analysis] The arrival volume of spodumene in January 2026 reached a record high   then declined in February.
2 hours ago
[SMM Analysis] The arrival volume of spodumene in January 2026 reached a record high then declined in February.
Read More
 [SMM Analysis] The arrival volume of spodumene in January 2026 reached a record high   then declined in February.
[SMM Analysis] The arrival volume of spodumene in January 2026 reached a record high then declined in February.
2 hours ago
Guangdong's First Standalone ESS Project Linked to Offshore Wind Grid
Mar 20, 2026 19:18
Guangdong's First Standalone ESS Project Linked to Offshore Wind Grid
Read More
Guangdong's First Standalone ESS Project Linked to Offshore Wind Grid
Guangdong's First Standalone ESS Project Linked to Offshore Wind Grid
On March 14, the Zhanjiang Xuwen 200 MW/400 MWh standalone shared ESS power station project, built by Energy China Guangdong Electric Power Design Institute under the integrated “research-industry-investment-construction-operation” model, was successfully connected to the grid, becoming Guangdong Province’s first standalone energy storage project connected to a large-scale offshore wind power grid connection point. The project adopts advanced grid-forming technology and a fully liquid-cooled cascaded LFP ESS, featuring millisecond-level rapid response, high safety, and a cycle life of more than 6,000 cycles, effectively enhancing the power grid’s capacity to accommodate and regulate fluctuating new energy sources such as offshore wind power. The project can simultaneously serve new energy consumption, power grid peak shaving and frequency regulation, and emergency power supply support, becoming a key carrier for the local development pattern of “wind and solar power + energy storage support + zero-carbon port industries.”
Mar 20, 2026 19:18
XPeng Motors Reports Q4 2025 Revenue Growth, Forecasts Q1 Delivery Decline
Mar 20, 2026 17:41
XPeng Motors Reports Q4 2025 Revenue Growth, Forecasts Q1 Delivery Decline
Read More
XPeng Motors Reports Q4 2025 Revenue Growth, Forecasts Q1 Delivery Decline
XPeng Motors Reports Q4 2025 Revenue Growth, Forecasts Q1 Delivery Decline
XPeng Motors' Q4 2025 revenue was 22.25 billion yuan, up 38.2% YoY; Q4 non-GAAP net profit was approximately 510 million yuan. XPeng Motors expected Q1 vehicle deliveries to decline 29.8%-35.1% YoY, to between 61,000 and 66,000 units.
Mar 20, 2026 17:41