[SMM Review] Colored Shanghai Zinc rose more than 1.5 percent overnight. Shanghai Aluminum opened slightly higher overnight.

Published: Jun 25, 2019 10:11 (GMT+8)
Shanghai nickel rose 0.71%, Shanghai tin increased 0.25%, Shanghai zinc rose more than 1.5%, Shanghai aluminum rose more than 0.5%, Shanghai lead rose 1.28%, Shanghai copper rose 0.34%. Black ups and downs vary, coke dropped nearly 1.5%, iron ore fell 0.62%, thread, hot coil rose nearly 1.5%, coking coal fell nearly 0.5%.

SMM6, March 25: as of press time, the whole line of colored red in early trading, most of the fluctuations are small, Shanghai nickel is up 0.71%, Shanghai tin is up 0.25%, Shanghai zinc is up more than 1.5%, Shanghai aluminum is up more than 0.5%, Shanghai lead is up 1.28%, Shanghai copper is up 0.34%. Black ups and downs vary, coke dropped nearly 1.5%, iron ore fell 0.62%, thread, hot coil rose nearly 1.5%, coking coal fell nearly 0.5%.

The strike at the Chuquicamata copper mine has cost Codelco $17.5 million, and industry analysts say the strike at the Chuquicamata copper mine, owned by Chilean state copper company (Codelco), has caused the company $17.5 million in economic losses. According to PLUSmining, a Chilean mining consulting firm, for each extended day of the strike, the company will lose 500 tons of copper production, equivalent to US $2.5 million, which means that the company has now evaporated 3500 tons of copper production as a result of the strike, resulting in a loss of US $17.5 million. The spot price of electrolytic copper in Shanghai is 30 yuan / ton to 90 yuan / ton, the transaction price of flat water copper is 46790 yuan / ton ~ 46840 yuan / ton, and the transaction price of copper is 46830 yuan / ton ~ 46880 yuan / ton. Shanghai Aluminum opened slightly higher overnight, up 13895 yuan in late trading, up 0.65 percent after the close of the three-month contract, up $1802 at night, or 1.81 percent, to close at $1800. Overnight aluminum rise led to a rise in Shanghai aluminum prices, late attention to the specific situation of Sino-US negotiations. On the domestic side, the aluminum market maintained to go to the warehouse, but the decline narrowed, the aluminum bar inventory began to accumulate again, and the output of the market after entering the off-season was weaker than in previous years.

In addition to the geopolitical premium to the crude oil market, the US-Iraq conflict has also had a great impact on the shipping market in the Middle East. Insurance companies have charged a higher war insurance surcharge on ships entering and leaving the Persian Gulf.

Today's forecast:

Copper: this morning, the leaders of the high-level economic and trade consultations between China and the United States spoke on the phone, which is expected to be conducive to market sentiment. Lun Copper opened higher in the morning. In addition, the expected tightening of crude oil supply increased, pushing crude oil strong upward exploration, but also for copper prices to provide upward momentum. Spot today long order delivery of the last day, the market is still in demand for the current monthly ticket supply, so today's holder price situation is still unshakable, but the market next month ticket source quotation is difficult to continue to be strong. The bronze is expected to be $5960 to $6010 per ton today. Shanghai copper 46600 47050 yuan / ton. Spot water 20-80 yuan per ton.

Aluminum: macro and release warming signal, the material Shanghai Aluminum main Company 1908 contract days to run in 13800 14100 yuan / ton, spot to the current month in Pingshui up 20 yuan / ton.

Lead: Lun lead still maintain a strong high concussion pattern, there is a short-term breakthrough upward possibility, pay attention to the amount of 1950 platform breakthrough. The pressure on the top of the Shanghai lead box is great, many attempts to break down have been suppressed, to a certain extent, suppress the bulls buy confidence, at the same time, because the fundamentals have not fundamentally changed, there is the possibility of a high fall in the short term.

Zinc: Brin Road under the track support strength, Lun zinc stop negative turn red, LME zinc inventory again recorded a decline of 1675 tons, give zinc price certain support, observe the integer gate pressing strength within a day, or run in the range around $2470 to $2520 / ton. Overnight, Shanghai zinc jumped on the next track of Brin Road, social inventory accumulation expectations fell short, short positions fled, helping to push Shanghai zinc higher, but the spot market is light, follow-up action can be considered, or the range runs around 19650-20150 yuan / ton. Material 0 # domestic to 1907 contract up 80 to 120, double Yan up 120 to 160

Nickel: below the nickel is supported by the 5-day EMA, which is forecast to be 12150 to 12300 US dollars / ton today, while the Shanghai nickel is supported by the 20-day EMA, which is expected to fluctuate in the range of 98500 to 100000 yuan / ton.

Tin: the resistance above Lunxi is expected to be near the 20-day moving average of $19200 / ton, the lower support is located at the previous platform high of $18800 / ton, and if it falls below effectively, the next support is near the previous low of $18500 / ton. It is estimated that the lower support of Shanghai tin is located in the vicinity of 143500 yuan / ton, and the upper resistance is located in the vicinity of the 10-day moving average of 144000 yuan / ton. Spot market, it is expected that today's Shanghai and tin spot market may continue to maintain a weak and stable market, the mainstream trading price of 142500 to 1445500 yuan / ton.

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
2 hours ago
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Read More
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Zambia’s sulphuric acid shortage is becoming a growing constraint on copper production and refining. Jubilee Metals reported acid costs rising by more than 200% in Q4 FY2026, while Sable cathode output fell to 250 t from 361 t in Q3. Government data also showed small-scale copper production down 35.2% YoY in H1 2026, highlighting the sector’s exposure to tight acid availability and higher processing costs.
2 hours ago
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
3 hours ago
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Read More
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Mines has outlined a potential restart of the past-producing Minto copper-gold-silver mine in Yukon, Canada, following the completion of a Preliminary Economic Assessment (PEA) that supports first concentrate production in the second half of 2028.​ The PEA outlines a 13-year mine life based on combined open-pit and underground mining, with operations designed around an average mining and milling rate of 4,100 mt/day. At peak production, the project is expected to produce approximately 27,200 mt/year of copper-equivalent contained in concentrate, equivalent to around 48,700 mt/year of high-grade copper-gold-silver concentrate.​ Initial capital required to re-establish production is estimated at C$186 million. Using the study's planning prices of US$5.00/lb copper, US$3,600/oz gold and US$50/oz silver, the PEA estimates an after-tax NPV at a 7% discount rate of C$494 million, an after-tax IRR of 47.8% and a payback period of approximately 1.9 years from first production.​ Minto benefits from substantial existing infrastructure from its previous operations, including a 4,100 mt/day processing plant as well as existing open-pit and underground infrastructure. Selkirk Copper said assessments of the site's existing infrastructure and equipment found that the majority remains in good working order and requires only minor attention and refurbishment.​ The company is targeting first concentrate production in H2 2028, followed by full ramp-up of mining, milling and concentrate production by H1 2029. A feasibility study is scheduled to begin in Q4 2026, while amended permit applications are also expected to be submitted during the fourth quarter. Selkirk Copper said a restart decision is targeted following completion of the feasibility study and receipt of permit amendments in H2 2027.​ The Minto PEA outlines a potential pathway for a previously producing copper operation to return to the market by 2028, supported by existing processing and mining infrastructure that could reduce the capital and construction requirements compared with a greenfield project. However, the 27,200 mt/year peak production figure represents copper-equivalent contained in concentrate rather than contained copper alone. The restart also remains subject to further feasibility work, permitting and project execution, making progress toward a restart decision in H2 2027 an important milestone to watch.
3 hours ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
3 hours ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Read More
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Consolidated Copper Corp (CCC) is targeting an early-2027 restart of open-pit mining at the Tschudi copper mine in northern Namibia, with an estimated US$30–40 million of development capital required to bring mining operations back online.​ Under the planned heap-leach restart, Tschudi is expected to reach run-rate copper cathode production of more than 14,000 mt/year over an initial 10-year mine life. CCC expects to complete a definitive feasibility study for the heap-leach mining restart in September 2026, with open-pit mining targeted to recommence in early 2027.​ The planned restart relates specifically to open-pit mining at Tschudi. Copper processing operations were restarted in 2024 using existing stockpiles, with CCC reporting production of more than 7,600 mt of copper cathode conforming to LME Grade A specifications as of June 2026. Tschudi previously produced approximately 75,000 mt of copper cathode between 2015 and 2020 before being placed on care and maintenance.​ The operation already has significant processing infrastructure in place, including a 2.88 million mt/year SX/EW plant. According to CCC, the US$30–40 million restart capital would primarily cover dewatering, mining mobilisation and demobilisation, a mobile crushing plant and development of a leach pad.​ CCC is also studying a larger expansion targeting Tschudi's sulphide resources. The concept includes construction of a 3 million mt/year flotation plant alongside the existing SX/EW operation, potentially increasing average annual production to approximately 30,000 mt of copper-equivalent over more than 10 years. The expansion remains under study and is separate from the planned heap-leach mining restart.​ The planned restart of open-pit mining at Tschudi could strengthen Namibia's copper supply by supporting run-rate cathode production of more than 14,000 mt/year if the project proceeds according to schedule. Existing SX/EW infrastructure and the relatively modest US$30–40 million restart capital requirement could support a faster return to mining compared with a greenfield development. However, the early-2027 restart remains a company target, with completion of the definitive feasibility study and subsequent mine mobilisation among the key milestones to watch.
3 hours ago