Home / Metal News / Yangjiang Kaibao New material finishing Project with an Annual output of 200000 tons of stainless Steel

Yangjiang Kaibao New material finishing Project with an Annual output of 200000 tons of stainless Steel

iconJun 18, 2019 11:56
Source:SMM

SMM News: a few days ago, Yangjiang Environmental Protection Bureau High and New Branch issued an acceptance announcement on the environmental impact report form of Yangjiang Kaibao New Materials Industry Co., Ltd., which produces 200000 tons of stainless steel finishing project annually.

Yangjiang Kaibao New material Industry Co., Ltd. has an annual output of 200000 tons of stainless steel finishing project is located in Yangjiang High-tech Zone Port Industrial Park Port Sanheng Road south plot, the total area of the project covers a total area of 66647.22 square meters, the total construction area is 44014 square meters, the total investment of the project is 300 million, the construction is carried out in two phases.

The construction contents include: high speed cutting production line, cutting edge flying shear leveling production line, high speed cutting leveling flying shear line, flat plate sanding line, whole roll frosting line, embossing line, plate 8K cleaning and drying line, whole roll 8K cleaning and drying production line, frosted titanium plate production line, 8K titanium plate production line, heat transfer production line, sandblasting line, etc., the first and second phases have a total annual output of 2B plate 26000 tons, sanding products 51000 tons, transfer products 5000 tons, Random products 1500 tons, cross products 1500 tons, 8K products 50000 tons, titanium products 25000 tons, embossing products 40000 tons, a total annual output of 200000 tons of stainless steel finishing products.

The total construction period is 1.5 years and the construction period is divided into two phases. The specific construction arrangements are as follows:

From August 2018 to December 2018, it is the pre-demonstration and preparation phase of the project.

June 2019, for the first phase of the project construction period.

In December 2019, for the construction period of the second phase of the project, the project was completed and accepted by the end of June 2020, and put into use.

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Nickel
nickel ore
electrolytic nickel
stainless steel

For queries, please contact Lemon Zhao at lemonzhao@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news