Analysis: Fire accident to cause nickel output loss at Jinchuan

Published: Jan 3, 2018 11:43
The workshop that caught fire at Jinchuan Group’s nickel smelter on New Year’s Eve has an annual production capacity of 30,000 mt and it produces both refined nickel and electrowinning nickel.

SHANGHAI, Jan 3 (SMM) – The workshop that caught fire at Jinchuan Group’s nickel smelter on New Year’s Eve has an annual production capacity of 30,000 mt and it produces both refined nickel and electrowinning nickel, SMM understood.

Total nickel production for Jinchuan’s smelter is targeted at 135,000 mt for 2018.

The workshop, No.3, produces sulphide ore products and intermediates using hydrometallurgy. Jinchuan’s other two workshops, however, do not have the capability to produce the intermediates via hydrometallurgy. This means that output of electrowinning nickel using the intermediates cannot be replaced by production at workshops No.1 and No.2.   

SMM estimated that it would take about three months to rebuild the facilities at workshop No.3.

If the workshop runs at 100% for the rest of the year after the rebuild, we estimated there would still be a loss of 2,250 mt of electrowinning nickel, which is mainly used by stainless steel mills.

For the first quarter, SMM estimated a loss of some 3,000 mt of refined nickel production if all production capacity of workshop No.3 can be transferred to the other two workshops. Losses could be more if not all capacities are transferred.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Stainless Steel Flash] Xinfeng Special Steel’s Phase II Bright Annealing Line Successfully Produces First Coil
15 hours ago
[SMM Stainless Steel Flash] Xinfeng Special Steel’s Phase II Bright Annealing Line Successfully Produces First Coil
Read More
[SMM Stainless Steel Flash] Xinfeng Special Steel’s Phase II Bright Annealing Line Successfully Produces First Coil
[SMM Stainless Steel Flash] Xinfeng Special Steel’s Phase II Bright Annealing Line Successfully Produces First Coil
On February 8, the 6# line of the Phase II Bright Annealing (BA) unit at Xinfeng Special Steel’s cold continuous rolling stainless steel project successfully produced its first coil, with the 304-series material meeting qualification standards on its initial run. General contracted by WISDRI (South China) Thermal Engineering, the Phase II project utilizes a domestic-first four-stage horizontal bright annealing unit design, featuring the longest muffle and largest TV (Tension-Velocity) capacity in China. As a key component of Xinfeng’s strategy to build a green, intelligent factory, the line reached production capacity immediately upon commissioning and is currently undergoing further optimization and debugging to produce high-grade BA plates and tube-making stock.
15 hours ago
[SMM Stainless Steel Flash] TISCO’s Self-Developed SUS630 Stainless Steel Plates Break Import Monopoly in PCB Sector
15 hours ago
[SMM Stainless Steel Flash] TISCO’s Self-Developed SUS630 Stainless Steel Plates Break Import Monopoly in PCB Sector
Read More
[SMM Stainless Steel Flash] TISCO’s Self-Developed SUS630 Stainless Steel Plates Break Import Monopoly in PCB Sector
[SMM Stainless Steel Flash] TISCO’s Self-Developed SUS630 Stainless Steel Plates Break Import Monopoly in PCB Sector
According to TISCO (Shanxi Taigang), its independently developed SUS630 precipitation-hardening stainless steel cold-rolled plates are now being supplied steadily to domestic Printed Circuit Board (PCB) manufacturers. Throughout the recent holiday period, the company's R&D and production teams maintained strict quality control to ensure the material meets the rigorous standards required for 5G communications, automotive electronics, and medical devices. As a core material for the hot lamination process in PCB manufacturing, SUS630 was long dependent on foreign imports; however, TISCO has now become the only stable domestic supplier, successfully breaking the technical blockade.
15 hours ago
[SMM Stainless Steel Flash] Wenzhou Yigang’s 700-ton Precision Tube Project Receives EIA Approval
15 hours ago
[SMM Stainless Steel Flash] Wenzhou Yigang’s 700-ton Precision Tube Project Receives EIA Approval
Read More
[SMM Stainless Steel Flash] Wenzhou Yigang’s 700-ton Precision Tube Project Receives EIA Approval
[SMM Stainless Steel Flash] Wenzhou Yigang’s 700-ton Precision Tube Project Receives EIA Approval
The Wenzhou Municipal Bureau of Ecology and Environment officially issued and announced its approval decision regarding the Environmental Impact Assessment (EIA) for Wenzhou Yigang Steel Co., Ltd.’s project. The approved project involves the annual processing of 700 tons of precision stainless steel tubes. This regulatory milestone clears a major legal hurdle for the facility, allowing the company to move forward with the construction and subsequent operation of its precision tube production capacity in line with regional environmental standards.
15 hours ago