Zhongjin Lingnan Zinc Smelter to Move into Maintenance

Published: Dec 1, 2017 14:40
SMM learned that since December, Zhongjin Lingnan zinc smelter will move into maintenance for about 20 days.

SHANGHAI, Dec.1 (SMM)-SMM learned that since December, Zhongjin Lingnan zinc smelter will move into maintenance for about 20 days, which will affect zinc ingot of Danxia and Nanhua brand for 8,000-10,000 tons output.


For news cooperation, please contact us by email: gaotian@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
3 hours ago
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Read More
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Contango Completes Camp-to-Portal Road and Bridges at Johnson Tract Polymetallic Project
Contango Silver & Gold announced that it had completed the camp-to-proposed-portal road, bridges and portal pad at its Johnson Tract polymetallic project in Alaska. Geotechnical drilling along the proposed coastal access road and barge facility easements has also been completed. Most environmental and cultural baseline studies are substantially complete, while permitting for the coastal road and barge facilities remains underway. The JT deposit has an existing indicated resource of 3.489 million tonnes grading 5.21% zinc and 0.67% lead, containing 400.8 million lb of zinc and 51.5 million lb of lead, alongside gold, silver and copper. The resource estimate has an effective date of July 12, 2022. The completed works prepare the site for subsequent underground exploration and feasibility studies. The project is not in production, and the completed road covers the camp-to-proposed-portal section.
3 hours ago
SHFE Zinc Futures Drop, East China Market Sees Improved Trading and Modest Premiums Rise
4 hours ago
SHFE Zinc Futures Drop, East China Market Sees Improved Trading and Modest Premiums Rise
Read More
SHFE Zinc Futures Drop, East China Market Sees Improved Trading and Modest Premiums Rise
SHFE Zinc Futures Drop, East China Market Sees Improved Trading and Modest Premiums Rise
【East China Zinc Ingot Market】 SHFE zinc futures prices fell notably, driven by the weaker futures market, downstream buyers in East China became more active in pricing since last night; however, actual fresh procurement remained relatively limited. During the morning session, overall trading activity in the East China zinc ingot market improved versus the previous trading day, and spot premiums edged up modestly. Per SMM data, today's SMM 0# zinc ingot average price was reported at RMB 26,620/mt, down RMB 925/mt day-on-day.
4 hours ago
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
4 hours ago
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Read More
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Kingfisher Reports High-Grade Lead-Zinc-Silver Intersections at Two Broken Hill Prospects
Kingfisher Mining has reported lead-zinc-silver drilling results from its Stephens Trig and Allendale prospects near Broken Hill, Australia. The first drilling at Stephens Trig since 2017 comprised five holes totaling 584 m. Results included 5 m at 7.4% combined lead and zinc and 10 g/t silver from 79 m downhole, including 2 m at 17.5% lead-zinc and 24 g/t silver. A separate interval returned 1 m at 198 g/t silver from 111 m. At Allendale, nine holes totaling 802 m returned 9 m at 8.05% lead-zinc and 17.9 g/t silver from 64 m, including 5 m at 10.37% lead-zinc and 23.2 g/t silver. Both prospects remain at the exploration stage.
4 hours ago
Zhongjin Lingnan Zinc Smelter to Move into Maintenance - Shanghai Metals Market (SMM)