Master Drilling announced a contract with Portuguese copper-zinc miner Boliden Somincor to construct two raisebored shafts, each 630 m deep and 4.5 m in diameter. The contract marks the company’s first project in Portugal.
The first 630 m pilot hole has been completed in 24 days using a single pilot bit throughout the operation, supported by the Micon RVDS guidance system. Master Drilling described the achievement as a company record.


![LME drags SHFE zinc lower [SMM zinc morning comment]](https://imgqn.smm.cn/usercenter/tAyyp20251217171754.jpg)
