SHANGHAI, Sept. 8 (SMM) – Shanxi Chalco Huarun Co., a coal-power-aluminum integrated company, will put aluminum project into operation at the end of this month.
Breaking News: Henan to Suspend Construction and Expansion of Small Bauxite and Iron Ore Mines
The project has an annual capacity of 500,000 tonnes.
China to Grant Huge Loans to Guinea to Secure Bauxite
The company is a JV between Chalco and Huarun Power.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn