Home / Metal News / Shanxi Jianlong 2.20 Mln-tpy Strip Steel Line to Come on Stream in September

Shanxi Jianlong 2.20 Mln-tpy Strip Steel Line to Come on Stream in September

iconJul 27, 2017 16:03
Source:SMM
Shanxi Jianlong Group will put online strip steel line with designed capacity of 2.20 million-tpy.

SHANGHAI, Jun. 27 (SMM) - Shanxi Jianlong Group will put online strip steel line with designed capacity of 2.20 million-tpy.

CISA: China Steel Inventories in 20 Cities Fall for 5 Months in July

The strip steel line is equipped with 1,080 m3 blast furnace which will reach operation in late August.

Shandong Laigang Yongfeng Starts 20-Day Maintenance at Rebar Lines

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Shanxi Jianlong Group
strip steel
steel
Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market exchanges, and relying on SMM's internal database model, for reference only and do not constitute decision-making recommendations.

For queries, please contact Lemon Zhao at lemonzhao@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news