High Temperature Shores Up Ignition Battery Demand, SMM Surveys

Published: Jul 14, 2017 16:05 (GMT+8)
Ignition battery replacement demand grew sharply recently due to high-temperature weather.

SHANGHAI, Jul. 14 (SMM) – Ignition battery replacement demand grew sharply recently due to high temperature.

Inventories at ignition battery distributors were around one month, with few exceeding one month, but those decreased to around 15 days for now, SMM learns. Some battery types even reported supply shortage. Distributors thus planned to build stocks.

Motive Battery Demand Falls Short of Market Forecast in Peak Season, SMM Reports

SMM Survey: Will Environmental Checks Keep Striking Lead Market?

However, orders at battery producers saw no significant improvement as falling lead prices raised distributors’ purchase caution, despite of improving end-user demand.

Orders at battery producers will increase from mid and late July in anticipation of stock-building demand from distributors, SMM expects.

For news cooperation, please contact us by email: sallyzhang@smm.cn orservice.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
7 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
7 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
11 hours ago
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Read More
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile’s Second Rig Arrives at Tribag–West Wedge to Test Seven Electromagnetic Targets
Nine Mile Metals announced that its second rig had arrived at Tribag–West Wedge in New Brunswick, Canada, with drilling expected to begin at Tribag in the coming days. Seven modelled electromagnetic targets are associated with the Tribag lead-zinc and West Wedge copper-lead-zinc occurrences. Wedge drilling continues in parallel. By September 21, the company had completed 18 holes totaling 4,934.50 metres of its 10,000-metre annual program. The conductors remain geophysical targets requiring drilling to establish their source.
11 hours ago
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Oct 01, 2026 10:06 (GMT+8)
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Read More
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
【SMM Flash News】Masivo Intersects 32.50 Metres of Lead-Zinc-Bearing Polymetallic Mineralization at Cerro Colorado.
Masivo Silver reported assays from CC-26-001, its first hole at Cerro Colorado in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres averaging 0.271% zinc, 0.141% lead and 7.0 g/t silver. Technical difficulties ended drilling at 259.5 metres while the hole remained within mineralized rock.
Oct 01, 2026 10:06 (GMT+8)