SHANGHAI, Jun. 8 (SMM) - A 5,000-tpy high-performance zinc alloy production line will be built in Guizhou Province, local paper reported.
Maintenance at China Zinc Smelters to Hurt Zinc Output in June, SMM Reports
Guizhou Metallurgical Chemical Industry Research Institute and Guizhou Hongda Environmental Protection Technology Co. established Industry-University-Research strategic cooperation June 6. The parties will joint construct a 5,000-tpy high-performance zinc alloy production line, which will help save energy consumption by about 30% per tonne compared to existing production lines.
Influx of Imported Zinc to Weigh on Chinese Zinc Prices, SMM Reports
The production line will realize nearly 100 million yuan of production value per annum.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn