SHFE Zinc Takes a Nosedive but will Stay High in Short-to-Medium Term, SMM Reports

Published: Apr 7, 2017 17:54
SHFE May zinc contract fell after opening and plunged at the end of trading, finishing 4% lower on Friday due to strong short momentum. Positions on SHFE zinc increased 29,000 tonnes.

SHANGHAI, Apr. 7 (SMM) - SHFE May zinc contract fell after opening and plunged at the end of trading, finishing 4% lower on Friday due to strong short momentum. Positions on SHFE zinc increased 29,000 tonnes.

Supply tightness eased recently after restarts at mines driven by high zinc prices, SMM said. Meanwhile, market confidence weakened toward consumption now that recoveries of end-user orders were slow. Frequent environmental protection inspections also constrained operation at North China-based galvanizers.

 Breaking News: What Triggers Wide-Spread Declines in China Base Metals Market on Friday? SMM Reports

Besides, zinc prices have remained above 20,000 yuan per tonne over the past six months, moving around 22,800 yuan per tonne from the beginning of 2017. This is also believed to have grown short sentiment. Technical indicators also point to mounting upward pressure.  

SMM reckons zinc will stay high in the near and medium term. The release of ore supply will be slow. Zinc smelters will only report limited output growth because of low zinc concentrate inventories. At the same time, inventories will fall as consumption improves with warmer weather.

Zinc ingot output declined 1.7% month-on-month in March, and fell 3% in April, according to an SMM survey. Output fell 20,000 tonnes year-on-year in the first four months of the year.

As of April 7, total zinc inventories in Shanghai, Guangdong and Tianjin decreased 1,400 tonnes to 259,500 tonnes, SMM data show.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
LME Zinc Plunges 2.5% from Four-Year High, Driven by Chinese Export Expectations and Copper Pullback
12 hours ago
LME Zinc Plunges 2.5% from Four-Year High, Driven by Chinese Export Expectations and Copper Pullback
Read More
LME Zinc Plunges 2.5% from Four-Year High, Driven by Chinese Export Expectations and Copper Pullback
LME Zinc Plunges 2.5% from Four-Year High, Driven by Chinese Export Expectations and Copper Pullback
[SMM Flash] Sep 10 — LME zinc plunged from its highs. As of 19:00 Beijing time, LME zinc fell to USD 3,960/t, down around 2.5%. The price reversed sharply just one day after hitting a more-than-four-year high of USD 4,065/t yesterday. The decline was mainly driven by mounting expectations of Chinese export deliveries onto the LME, compounded by a sharp pullback in LME copper amid shifting tariff expectations, which weighed on risk appetite across the base metals complex. Keep watching the LME time spreads (contango/back) and the pace of zinc warrant deliveries going forward.
12 hours ago
Data: SHFE, DCE market movement (Sep 10)
15 hours ago
Data: SHFE, DCE market movement (Sep 10)
Read More
Data: SHFE, DCE market movement (Sep 10)
Data: SHFE, DCE market movement (Sep 10)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 10 Sep , 2026
15 hours ago
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
17 hours ago
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
Read More
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
Salazar Resources Updates Curipamba-El Domo Project in Ecuador, Targets July 2027 Production Start
On September 9, Salazar Resources updated progress on the Curipamba-El Domo polymetallic project in Ecuador, a JV with Silvercorp in which Salazar holds 25% (carried to production) and Silvercorp holds 75% as operator. The project has measured and indicated resources of 11.4 Mt grading 1.85% Cu, 2.11 g/t Au, 2.42% Zn and 0.22% Pb. Designed throughput is 666,000 t/year, with first production expected in July 2027 and an 11.5-year mine life.
17 hours ago