【SMM Flash News】Benton Acquires Land Near Dominion and Advances Lead-Zinc VMS Exploration

Published: Oct 06, 2026 11:01 (GMT+8)

Benton Resources announced on October 5, 2026 that it had signed an agreement with Quest Inc. to acquire six mineral claim units contiguous with its Dominion project in Newfoundland. Subject to exchange approval, Benton will pay C$20,000 in cash and issue 400,000 shares. The vendors will retain a 2.5% net smelter return royalty, with Benton holding the right to buy back 1.5% for C$1.5 million. A C$6,000 annual payment will begin 48 months after signing. The parcel lies about 600 metres along strike from surface samples grading up to 10.8 g/t gold, while 159 channel-sample results remain pending.

Dominion also hosts volcanogenic massive-sulphide areas including Ellie and Trinity. Benton previously reported a 0.5-metre Ellie channel sample grading 10.60% zinc, 3.14% lead, 0.83% copper and 45.10 g/t silver, and a 2.0-metre Trinity sample grading 1.47% zinc, 0.32% lead, 0.08% copper and 10.72 g/t silver.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
1 hour ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Read More
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Semtech said in its Aug. 25 earnings presentation that its data-center photonics portfolio spans gain chips, high-power CW lasers, SOAs and high-speed photodiodes, while it has secured FY2027 equipment deliveries and acquired additional cleanroom space. Semtech acquired HieFo in March, adding US-based InP gain-chip and DFB-laser manufacturing. Q2 FY2027 data-center sales reached $100 million, up 39% QoQ and 91% YoY; Q3 sales are targeted to rise 45% QoQ and 160% YoY. SMM believes the buildout supports medium-term demand for InP and high-purity indium, although no nameplate capacity or indium consumption was disclosed.
1 hour ago
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
1 hour ago
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
Read More
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
【SMM Flash News】Renforth Reports 10.9 Metres Grading 0.544% Zinc at Victoria
Renforth reported on October 5 that hole SUR-26-60 at its Victoria polymetallic project in Québec intersected 10.9 metres grading 0.544% zinc, 0.079% copper and 0.51 g/t silver from a downhole depth of 17.1 metres. The three-hole, 1,011-metre programme was completed in July to test down-dip continuity beneath the existing resource pit shell.
1 hour ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
1 hour ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Read More
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Bunker Hill said on October 5 that its Idaho zinc-lead-silver mine remained on track to achieve commercial production by year-end 2026. The revised criteria require throughput of at least 65% of the plant’s 1,800-tonne-per-day nameplate capacity, alongside zinc, lead and silver recoveries of at least 70%, for 60 consecutive days. A 10-hole, 975-metre surface drilling programme has also started at Page.
1 hour ago