How Will China Actions Affect Zinc Market? SMM Reports

Published: Feb 17, 2017 10:47 (GMT+8)
China’s Ministry of Environmental Protection announced it will execute air quality inspections during February 15-March 15 in 18 cities, SMM learns.

SHANGHAI, Feb. 17 (SMM) - China’s Ministry of Environmental Protection announced it will execute air quality inspections during February 15-March 15 in 18 cities, SMM learns. These cities include Beijing, Tianjin, Hebei’s Shijiazhuang, Langfang, Baoding, Tangshan, Handan, Xingtai, Cangzhou, Hengshui, Shanxi’s Taiyuan and Linfen, Shandong’s Jinan and Dezhou and Henan’s Zhengzhou, Hebi, Jiaozuo and Anyang, which are major metal producing regions.

SMM Survey: What’s Impact on China Base Metals Market from New Environmental Drive?

In these 18 cities, Tianjin, Hebei, Cangzhou and Hengshui have an agglomeration of galvanizers. Large steel tube/pipe plants reported slow sales due to weak demand and environmental protection factor, so they did not reach full operation, SMM said. 50% of galvanizers in Daqiu Village, Tianjin are still restricted as they have yet to complete coal-to-gas switch.

Plants in some regions were not affected yet as the inspections are not so strict during February 15-28. Any effect from environmental protection on galvanizers in Hengshui and Handan is only limited, with production steady. Zinc oxide producers in Hebei and Tianjin were not affected and returned to normal production after the 2017 Chinese New Year holiday. No plants in Jiangsu and Zhejiang reported production restrictions, SMM understands.

But operating rates at galvanizers and zinc oxide producers will be constrained in March as the execution of inspections step up, SMM added. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)