US Weekly Raw Steel production slumps by over 1%

Published: Dec 15, 2015 13:25 (GMT+8)
The weekly raw steel output by the US dropped over 1% during the week ended December 12th, 2015.

By  (ScrapMonster Author)

December 15, 2015 01:09:24 AM

ALBANY (Scrap Monster): As per the statistics released by the American Iron and Steel Institute (AISI), the raw steel production by the country dropped marginally by 1.1% during the week ended December 12th, 2015. The production had rebounded sharply by 4.4% during the week prior to this.

The total domestic raw steel output during the week ending December 12th was 1,536,000 net tons. The AISI data indicates that the US raw steel production has declined slightly by 1.1% during the week. This is in comparison with the previous week (ie., the week ended Dec 5th)  production figures of 1,553,000 net tons. Also, the weekly output represents a sharp decline of 14.4% in comparison with production of 1,795,000 net tons during same week the previous year.

The capability utilization rate of US steel makers declined to 64.2% during the week ended Dec 12th, 2015.

The capacity utilization rate has declined marginally when compared with 65.0% during the previous week (ie., the week ending December 5th). Also, capacity utilization was considerably lower when compared with the rate of 74.6% during same week the previous year.

The region-wise comparative weekly production figures are provided below:-    

 

Region

Steel production (in ‘000 nt)

% Change

Week ended Dec 5th

Week ended Dec 12th

North East

193

192

-0.52

Great Lakes

575

547

-4.87

Southern

513

506

-1.36

Western

76

74

-2.63

Midwest

196

217

+10.71

The American Iron and Steel Institute (AISI) is an association of North American steel producers. AISI's member companies represent over three quarters of both U.S. and North American steel capacity.


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Nickel Flash News】Central Sulawesi Calls for Full Nickel Downstreaming to Finished Products
36 mins ago
【SMM Nickel Flash News】Central Sulawesi Calls for Full Nickel Downstreaming to Finished Products
Read More
【SMM Nickel Flash News】Central Sulawesi Calls for Full Nickel Downstreaming to Finished Products
【SMM Nickel Flash News】Central Sulawesi Calls for Full Nickel Downstreaming to Finished Products
The Central Sulawesi provincial government emphasized that nickel and other mineral resources should be processed domestically into finished products rather than being exported as raw or semi-processed materials. Deputy Governor Reny A. Lamadjido said deeper downstreaming would increase the economic value captured by the region, create employment and support the development of businesses around industrial areas. Central Sulawesi currently has 151 mining business permits (IUPs) and 293 permits for non-metallic minerals and rocks. Processing industries accounted for 44.37% of the province's GDP in Q2 2026, while mining and quarrying contributed 13.79%, highlighting the importance of the mining-processing sector to the regional economy.
36 mins ago
Data: SHFE, DCE market movement (Sep 29)
1 hour ago
Data: SHFE, DCE market movement (Sep 29)
Read More
Data: SHFE, DCE market movement (Sep 29)
Data: SHFE, DCE market movement (Sep 29)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 29 Sep , 2026
1 hour ago
[SMM Nickel Market Flash] NiWest DFS Outlines 35-Year Mine Life with 84.7 Mt Ore Reserve
1 hour ago
[SMM Nickel Market Flash] NiWest DFS Outlines 35-Year Mine Life with 84.7 Mt Ore Reserve
Read More
[SMM Nickel Market Flash] NiWest DFS Outlines 35-Year Mine Life with 84.7 Mt Ore Reserve
[SMM Nickel Market Flash] NiWest DFS Outlines 35-Year Mine Life with 84.7 Mt Ore Reserve
The 2024 definitive feasibility study for Alliance Nickel’s NiWest project outlines a 35-year open-pit operation producing battery-grade nickel-cobalt sulphate. The project has an ore reserve of 84.7 million tonnes grading 0.94% nickel and 0.06% cobalt, with a post-tax NPV of about A$1.5 billion and a post-tax IRR of 17.6%. Alliance Nickel is now using its vat-leach test program to refine the project flowsheet and capital requirements ahead of further feasibility updates.
1 hour ago