Peru metal output rises in April, silver production lags

Published: Jun 10, 2015 17:33
The production of almost all major metals by Peru reported robust growth in Peru during the month of April this year.

 Author: Paul Ploumis 

10 Jun 2015 Last updated at 03:27:08 GMT
 
LIMA (Scrap Monster): The production of almost all major metals by Peru reported robust growth in Peru during the month of April this year. While the output of copper, gold and zinc reported significant increase during the month, silver production declined, in accordance with the official government data released yesterday.
 
According to data released by the Energy and Mines Ministry, copper production rose 18.5% from 103,410 mt in April last year to 122,506 mt in Apr ’15. The decline in copper output from Freeport-McMoRan's Cerro Verde was offset by increased mine output from Antamina, Southern Copper, Toromocho and Antapaccay mines.
 
The increased output from Newmont and Barrick gold mines contributed to the 15% growth in gold production during April this year. The gold production totaled 379,504 Oz in Apr ’15, in comparison with the output of 330,273 Oz during the same month a year before.
 
Silver production dropped marginally by 0.4% over the year from 9.57 MOz to 9.53 MOz in April. The output from Antamina mines dropped significantly, whereas Buenaventura and Volcan reported rise in silver production during the month.
 
Zinc production rose 17.7% from 97,128 mt a year before to 114,323 mt in Apr ’15. Lead output too rose 27% from 97,128 mt to 114,323 mt over the previous year. Lead output witnessed sharp increase in Antamina, Volcan and Milpo. Molybdenum output too jumped 45% to 1,632 mt in April 2015.
 
Meantime, tin production by Minsur- the country’s only tin producer, rebounded sharply in April this year, rising nearly 15% from 1,438 mt in April 2014 to 1,654 mt in April this year.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Sep 07)
4 hours ago
Data: SHFE, DCE market movement (Sep 07)
Read More
Data: SHFE, DCE market movement (Sep 07)
Data: SHFE, DCE market movement (Sep 07)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 07 Sep , 2026
4 hours ago
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
4 hours ago
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Read More
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
The 300,000 mt/year copper cathode expansion project of JCC Hongyuan Copper, a subsidiary of Jiangxi Copper Corporation, entered the pre-approval public notice stage of its environmental impact assessment on September 4, with a total investment of approximately 1.416 billion yuan. The project is planned to start construction in September 2026 and be completed in December 2027. Upon completion, JCC Hongyuan's total capacity will jump from 250,000 mt to 550,000 mt.
4 hours ago
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
4 hours ago
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Read More
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Panoro Intersects 808.2m of Copper-Gold Mineralisation at Peru’s Cotabambas Project
Panoro Minerals has reported new assay results from its Cotabambas copper-gold-silver project in southern Peru, with drill hole CB-230 intersecting 808.15 metres grading 0.22% copper, 0.10 g/t gold and 1.53 g/t silver, equivalent to 0.31% CuEq using Panoro’s stated metal-price and metallurgical-recovery assumptions. The interval was encountered from 296.35 metres to 1,104.50 metres downhole. Within the broader mineralised interval, CB-230 returned 240.15 metres grading 0.32% copper, including 156.50 metres at 0.38% copper and a higher-grade 48.10-metre interval at 0.57% copper, 0.25 g/t gold and 4.08 g/t silver. Drill hole CB-229 separately intersected 303.30 metres at 0.14% copper, including 69.90 metres at 0.27% copper. Panoro said the latest drilling, together with previously reported hole CB-228, indicates continuity of the higher-grade mineralisation across approximately 600 metres of strike and from surface to more than 1,100 metres depth. Mineralisation remains open, and additional holes CB-231, CB-232 and CB-233 have commenced to test further extensions around and below the South Pit. The latest results strengthen Panoro’s geological case for expanding the higher-grade component of the Cotabambas resource, particularly as drilling has yet to define the limits of mineralisation around the South Pit. Cotabambas currently hosts 507.3 Mt of indicated resources and 496.0 Mt of inferred resources, with a higher-grade component of 129.0 Mt indicated and 93.1 Mt inferred. However, the project remains in the exploration and development stage, meaning the new intersections have no immediate impact on copper supply and will need to be incorporated into future resource modelling and technical studies before their economic significance can be assessed.
4 hours ago