Turkish scrap imports plunged in January

Published: Mar 12, 2015 11:02
According to the Turkish Statistical Institute, the total scrap imports by Turkey during the month of January this year declined sharply by nearly 29% from the previous year.

Author: Paul Ploumis
11 Mar 2015 Last updated at 08:30:33 GMT
ANKARA (Scrap Monster): According to the latest data released by the Turkish Statistical Institute (TUIK), the total scrap imports by Turkey during the month of January this year declined sharply by nearly 29% from the previous year. However, scrap imports during the month were slightly higher when compared with Dec ’14.

The country’s scrap imports during Jan ‘15 totaled 1.38 million metric tons. Turkey had imported 1.95 million tons of scrap during January last year. This is in line with the 10.4% drop in crude steel output by the country in January this year. TUIK figures indicate that Turkey’s crude steel output totaled 2.58 million mt during Jan ’15.

The largest scrap exporter to Turkey during January was the UK. The country exported 424,703 metric tons of scrap to Turkey, constituting 30% of the total Turkish imports during the month. The imports from the UK jumped significantly higher by 59% during the month over the previous year. The monthly scrap imports were 30% higher when compared with the previous month. The second largest scrap supplier to Turkey was Russia with 214,981 tons, up by 14.7% over the year. In third place was the US with 184,629 tons. The scrap imports from the US dropped sharply by 62% when matched with Jan ‘14.

The other key scrap suppliers to Turkey during Jan ’15 were Belgium (104,146 mt), Netherlands (79,228 mt), Romania (72,976 mt) and Canada (46,108 mt).

The scrap import prices averaged at $318 per mt CFR during the month.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Tin Express: Minsur Q2 Refined Tin Production 7,034 mt, YoY Down 1%]
1 hour ago
[SMM Tin Express: Minsur Q2 Refined Tin Production 7,034 mt, YoY Down 1%]
Read More
[SMM Tin Express: Minsur Q2 Refined Tin Production 7,034 mt, YoY Down 1%]
[SMM Tin Express: Minsur Q2 Refined Tin Production 7,034 mt, YoY Down 1%]
Peruvian refined tin producer Minsur reported that its Pisco smelter in Peru produced 7,034 mt of refined tin in Q2 2026, down 1% YoY. Cumulative H1 refined tin production was 15,349 mt, down 2% YoY. The company attributed the slight decline in tin production to lower head grade at the smelter (a strategic adjustment to maximize recovery), partially offset by higher throughput at the Pisco smelter. By project, the San Rafael underground mine produced 7,359 mt of tin-in-concentrate in Q2, up 14% YoY, with H1 cumulative output of 13,455 mt, up 6% YoY; B2 tailings production rose 11% YoY to 2,152 mt in Q2, with H1 cumulative output of 4,049 mt, up 7% YoY. Total tin-in-concentrate production in Q2 rose 13% YoY to 9,511 mt, with H1 cumulative output of 17,504 mt, up 6% YoY. The head grade at the San Rafael mine in Q2 improved 13% to 2.88% Sn, with H1 average head grade of 2.64% Sn, up 8% YoY. Minsur noted that the ore sorting system processed more low-margin ore.
1 hour ago
[SMM Tin Flash: Metals X Q2 Tin Concentrates Production at 2,809 mt]
1 hour ago
[SMM Tin Flash: Metals X Q2 Tin Concentrates Production at 2,809 mt]
Read More
[SMM Tin Flash: Metals X Q2 Tin Concentrates Production at 2,809 mt]
[SMM Tin Flash: Metals X Q2 Tin Concentrates Production at 2,809 mt]
Australian tin miner Metals X Limited (ASX: MLX) released its Q2 2026 operational report. The report showed that the company’s Renison tin mine produced 2,809 tonnes of tin metal in tin concentrates in Q2, down approximately 2.7% QoQ from 2,887 tonnes in Q1. On the production side, ore mined totaled 200,300 tonnes in Q2, down 6.11% QoQ, mainly due to limited availability of loaders, trucks, and hoists, along with stope sequencing delays. The ore grade mined was 1.58% Sn, slightly lower than the 1.63% in Q1. Ore milled reached 183,800 tonnes, up 14.60% QoQ, with mill head grade declining to 1.95% Sn (Q1: 2.24% Sn), and the processing recovery rate was 78.55% (Q1: 80.35%). For the Renison mineral resource update, total resources increased to 21.8 million tonnes at a grade of 1.38% tin, containing 300,300 tonnes of tin. Measured and Indicated tin content rose 7% to 264,100 tonnes. The mine life plan and ore reserve update are expected to be completed in Q3.
1 hour ago
[SMM Tin Express: PT Timah's H1 tin ore production reached 12,232 mt of tin metal, up 75% YoY]
2 hours ago
[SMM Tin Express: PT Timah's H1 tin ore production reached 12,232 mt of tin metal, up 75% YoY]
Read More
[SMM Tin Express: PT Timah's H1 tin ore production reached 12,232 mt of tin metal, up 75% YoY]
[SMM Tin Express: PT Timah's H1 tin ore production reached 12,232 mt of tin metal, up 75% YoY]
Indonesian tin miner PT Timah Tbk (IDX: TINS) released its H1 2026 performance report. The report shows tin ore production in H1 was 12,232 mt Sn, up 75% YoY, including onshore production of 4,716 mt (up 97%) and offshore production of 7,516 mt (up 63%). Refined tin production was 10,865 mt, up 58% YoY; refined tin sales were 10,984 mt, up 85% YoY. On a monthly basis, refined tin production in Q2 2026 was 5,235 mt, down 7.0% from the previous quarter.
2 hours ago