Tender Announcement for the New PV Power Station Project in Shibize Village, Dianshi Town, Hengshan District, Yulin City, Shaanxi Province

게시됨: Dec 18, 2024 09:42
[Shaanxi Yulin City Hengshan District Dianshi Town Shibize Village New PV Power Station Project Tender Announcement] Recently, the Shaanxi Provincial Public Resource Trading Center on the National Public Resource Trading Platform released a competitive consultation announcement for the new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City. The project tender scope mainly includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the city's second batch of consolidation funds. (Polaris Solar PV Network)

Recently, the National Public Resource Trading Platform Shaanxi Province Public Resource Trading Center issued a competitive consultation announcement for the new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City. The project bidding scope mainly includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the second batch of municipal-level consolidation funds.

Details are as follows:

Competitive Consultation Announcement for the New PV Power Station Project in Shibize Village, Dianshi Town, Hengshan District, Yulin City

I. Bidding Conditions

The new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City has met the bidding conditions. The bidder is the Agriculture and Rural Affairs Bureau of Hengshan District, Yulin City, and the construction funds are sourced from fiscal funds, which have been secured. The bidding method is competitive consultation.

II. Project Overview and Bidding Scope

Project Overview: The main content includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the second batch of municipal-level consolidation funds.

Contract Division: Divided into one contract section.

III. Applicant Qualification Requirements

1. Qualification Requirements: Applicants must possess a Grade III or above general contracting qualification for power engineering construction issued by the construction administrative authority and have corresponding performance capabilities in terms of personnel, equipment, and funds. They must be independent legal entities legally registered and established in China during their operating period, holding a valid business license with a unified social credit code.

2. Project Manager: The proposed project manager must hold a second-level or above registered constructor qualification in mechanical and electrical engineering, possess a valid safety production assessment certificate (Certificate B), and not serve as the project manager for any other ongoing projects.

3. Safety Production Permit: Bidders must hold a valid safety production permit.

4. Financial Requirements: Provide financial audit reports for the past three years issued by an accounting firm or audit institution (financial audit reports for 2021-2023, three in total). Companies established for less than three years must provide financial audit reports from the year of establishment to the present. Companies newly established in 2024 must provide a bank credit certificate.

5. Credit Requirements: The basic information of the applicant and the proposed project manager must be searchable on the "Shaanxi Provincial Department of Housing and Urban-Rural Development" website. Applicants with any of the following circumstances are not eligible to bid (items 1-3 require a commitment letter, item 4 requires a credit report and website query screenshot).

(1) Ordered to cease operations;

(2) Assets under custody or frozen;

(3) Disqualified from bidding due to penalties imposed by relevant administrative enforcement authorities (blacklist);

(4) Listed as a seriously dishonest entity on Credit China (.cn/xinyongfuwu/shixinheimingdan/) or having bribery criminal records on the China Judgments Online (http://wenshu.court.gov.cn/) (executed persons include contractors, legal representatives, and project managers). The credit report download time must be within the period from the issuance of the competitive consultation documents to the consultation deadline.

IV. Acquisition of Competitive Consultation Documents

Acquisition Time: From 9:00 AM on December 18, 2024, to 5:00 PM on December 24, 2024.

Acquisition Method: Applicants participating in this project consultation must register on the Shaanxi Province Public Resource Trading Center platform and confirm their bid for this project before the registration deadline (excluding weekends and statutory holidays). They must bring the bid confirmation receipt, company introduction letter, authorization letter (or legal representative identification), a copy of the qualification certificate stamped with the company seal, and the original and a copy of the applicant's ID card (stamped with the company seal) to the second floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yulin City, Shaanxi Province, to obtain the consultation documents.

V. Submission of Consultation Response Documents

Submission Deadline (Bid Deadline, the same hereinafter): 3:00 PM on December 30, 2024.

Submission Method: Paper documents must be submitted to the multifunctional conference room on the third floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yuyang District, Yulin City, Shaanxi Province.

VI. Consultation Time and Location

Consultation Time: 3:00 PM on December 30, 2024.

Consultation Location: Multifunctional conference room on the third floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yuyang District, Yulin City, Shaanxi Province.

VII. Others:

7.1 Bidding Method: Competitive consultation.

7.2 Construction Location: Shibize Village, Dianshi Town, Hengshan District, Yulin City.

7.3 Construction Period: 150 calendar days.

7.4 Bidding Scope: The main content includes the construction of a new 700KW PV power station.

7.5 Announcement Media:

This bidding announcement is published on the "Shaanxi Province Public Resource Trading Platform" and the "Shaanxi Procurement and Bidding Network."

7.6 Other Requirements:

(1) Applicants with the same person in charge or with controlling or management relationships between different entities are not allowed to participate in the same project.

(2) CA Lock Purchase: ① On-site purchase at Yulin City Civic Center, 3rd Floor, Windows E18 and E19, Phone: 0912-3452148. Bid confirmation procedure: Log in to the National Public Resource Trading Center Platform (Shaanxi Province) (/), select "Electronic Trading Platform - Shaanxi Government Procurement Trading System - Enterprise End" to log in, and after logging in, select the "Transaction Party B" identity to enter the applicant interface for bid confirmation.

VIII. Supervisory Authority

This project is supervised by the Development and Reform and Science and Technology Bureau of Hengshan District, Yulin City.

IX. Contact Information (Same as Objection Contact Information)

Bidder: Agriculture and Rural Affairs Bureau of Hengshan District, Yulin City.

Address: Room 807, 8th Floor West, No. 9 Beida Street, Hengshan District, Yulin City, Shaanxi Province.

 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[태양광: 뉴저지, 발코니 태양광 법안 통과]
2시간 전
[태양광: 뉴저지, 발코니 태양광 법안 통과]
더 보기
[태양광: 뉴저지, 발코니 태양광 법안 통과]
[태양광: 뉴저지, 발코니 태양광 법안 통과]
뉴저지주가 ‘가든 스테이트 발코니 태양광법’을 제정하며, 플러그인 태양광 시스템을 명시적으로 허용한 미국 내 9번째 주가 되었다. 이 법에 따라 플러그인 태양광 기기는 표준 120V 콘센트를 통해 주택의 기존 전기 시스템에 연결할 수 있다. 소비자는 상호접속 계약 없이 총 출력 1,200W 이하의 휴대용 태양광 기기를 사용할 수 있으며, 400W 이하 시스템은 건물 배선이나 전기 패널 변경 요건이 면제되지만 안전 기준은 충족해야 한다. 또한 이 법은 집주인, 주택소유자협회, 지방자치단체가 이러한 시스템을 금지하거나 사용 허가를 요구하는 것을 막는다. 이 법은 2027년 3월 1일부터 시행된다.
2시간 전
[태양광: 8월 포르투갈에서 태양광 발전량이 사상 최고치를 기록]
2시간 전
[태양광: 8월 포르투갈에서 태양광 발전량이 사상 최고치를 기록]
더 보기
[태양광: 8월 포르투갈에서 태양광 발전량이 사상 최고치를 기록]
[태양광: 8월 포르투갈에서 태양광 발전량이 사상 최고치를 기록]
포르투갈의 태양광 발전량은 8월에 약 3.85GW로 사상 최고치를 기록했으며, 이는 지속적인 설비용량 증가에 힘입은 결과다. 2025년 12월부터 2026년 5월 사이에 372MW의 태양광 설비가 추가되면서 누적 용량은 약 7.3GW에 도달했다. 태양광 PV는 7월에 처음으로 포르투갈 최대 전력 생산원이 되어 국가 소비량의 19%를 담당했으며, 수력(16%)과 풍력(13%)을 앞질렀다. 8월에는 재생에너지가 소비량의 52%를 공급했다. 올해 첫 8개월 동안 재생에너지는 포르투갈 전력 소비량의 66%를 충당했으며, 수력 25%, 풍력 23%, 태양광 13%를 기록했다. 스페인과의 상호연계 용량 강화에 힘입어 순전력 수입량도 5.2GW를 넘어서며 새로운 최고치를 기록했다.
2시간 전
[솔라: 브라질 상원, 재생에너지 사용과 연계한 데이터센터 세제 혜택 승인]
2시간 전
[솔라: 브라질 상원, 재생에너지 사용과 연계한 데이터센터 세제 혜택 승인]
더 보기
[솔라: 브라질 상원, 재생에너지 사용과 연계한 데이터센터 세제 혜택 승인]
[솔라: 브라질 상원, 재생에너지 사용과 연계한 데이터센터 세제 혜택 승인]
브라질 연방 상원이 데이터센터를 위한 특별 조세 제도인 Redata를 신설하는 법안 278/2026을 승인했다. 이 법안은 장비 및 부품에 대한 수입 관세, IPI, PIS/Cofins 연방세를 5년간 면제한다. 혜택을 받기 위한 조건 중 하나로, 데이터센터는 계약된 전체 전력 수요를 재생에너지 또는 저배출 전원을 활용한 공급 계약이나 자가 발전을 통해 충족해야 한다. 2021년부터 2024년까지 발전 사업자와 데이터센터 간에 총 330MW, 약 77억 헤알(14억 달러) 규모의 장기 재생에너지 계약 11건이 체결되었으며, 브라질 데이터센터 시장이 성장함에 따라 새로운 제도는 태양광·풍력 프로젝트와 PPA 수요를 더욱 확대할 것으로 기대된다. 이 법안은 이제 대통령 재가를 위해 송부된다.
2시간 전
Tender Announcement for the New PV Power Station Project in Shibize Village, Dianshi Town, Hengshan District, Yulin City, Shaanxi Province - Shanghai Metals Market (SMM)