**[Turkey Policy]**
The Ministry of Economy of Turkey has introduced new regulations to cancel the investment incentive policy for imported solar panels. The new regulations stipulate that investment projects must be completed within the prescribed time limit. If an extension is needed, an application can be made, but the extension period cannot exceed half of the original time limit and must be for at least one year. This measure aims to promote the development of the domestic solar energy industry and reduce dependence on imports.
![PV 프레임 가동률 안정적, 기대 약화; 알루미늄 잉곳 재고 감소 가속, 알루미늄 가격 중심 상승 [SMM 분석]](https://imgqn.smm.cn/usercenter/chMqV20251217171743.jpg)
![[SMM PV 플래시]](https://imgqn.smm.cn/usercenter/xAoMy20251217171743.jpg)
![[SMM PV 뉴스] 화넝 산시 선무 100MW 태양광 프로젝트 전용량 계통 연계 달성](https://imgqn.smm.cn/usercenter/HKFoG20251217171742.jpg)
