[Up to 45 million yuan in subsidies! Three ministries jointly issued documents to speed up the construction of integrated solar energy storage and charging projects]
Recently, the Ministry of Finance, the Ministry of Industry and Information Technology, and the Ministry of Transport jointly issued a notice on carrying out the pilot work of filling the short board of local charging and exchanging facilities, launching the "hundreds of counties, thousands of stations, and tens of thousands of piles" pilot project. The first batch will be launched in 70 pilot counties across 24 provinces nationwide, focusing on rural areas with good coverage of distributed photovoltaics to integrate the construction of photovoltaic power generation, energy storage, and charging and exchanging integrated charging infrastructure according to local application conditions.
The central government will allocate reward funds to support pilot counties in carrying out pilot work. The demonstration period for each pilot county is 3 years. The reward standards are set based on the power utilization rate of the charging and exchanging facilities in the pilot counties each year, divided into three levels. During the demonstration period, pilot counties that achieve the highest target every year can receive up to 45 million yuan.
![[전고체 배터리: 톈넝, 반고체 314Ah 배터리 셀 규모화 납품 달성, 다중 기술 체계에서 단계적 돌파구 마련]](https://imgqn.smm.cn/usercenter/JmyWy20251217171729.png)
![[전고체 배터리: 에코프로비엠, “원료-소재-배터리 셀” 전 과정 아우르는 전고체 배터리 팀 구축, 2027년 상용화 목표]](https://imgqn.smm.cn/usercenter/JMINH20251217171728.jpg)
![[에너지 저장: 추넝, 중국 저장 기업 20곳이 남미를 주시하는 가운데 4건 계약 체결]](https://imgqn.smm.cn/usercenter/zWZVI20251217171730.jpg)