Domestic PV-grade EVA granule prices continue to rise, photovoltaic glass new order prices to fall

게시됨: Feb 1, 2024 15:11
Polysilicon: The mainstream prices of recharging polysilicon and dense polysilicon were 60-63 yuan/kg and 56-60 yuan/kg respectively yesterday.

SHANGHAI, Feb 1 (SMM) -

Polysilicon

Polysilicon: The mainstream prices of recharging polysilicon and dense polysilicon were 60-63 yuan/kg and 56-60 yuan/kg respectively yesterday.

Supply and Demand

The price of polysilicon was stable and fluctuated slightly. The transaction volume of N-type material continued to rise this month. With the signing price of 72 yuan/kg, the market price this month has basically been decided. The current inventory of N-type material is limited, and the market price has certain support in the short term.

Solar cell

Price

The current price of high-efficiency PERC182 cells (23.2% and above efficiency) is about 0.38-0.39 yuan/W; the price of PERC210 cells is about 0.38-0.39 yuan/W; the price of Topcon182 cells (24.4% and above efficiency) is about 0.45-0.47 yuan/W ;Topcon210 battery cell 0.49-0.50 yuan/w.

Supply and Demand

Currently, battery prices are still at a stalemate. As battery factories closed, operating rates are declining. However, during the Chinese New Year, battery supply is still greater than the component production schedule, and is in a storage accumulation cycle.

PV film

Price: EVA/POE photovoltaic material:

The current trading price of domestic EVA photovoltaic materials is around 11,000-11,100 yuan/ton, and the price of domestic 2825 photovoltaic materials continues to increase.

Supply and demand: EVA/POE photovoltaic materials:

The current supply remains stable, the downstream has begun a holiday, and purchases have slowed down.

Price: PV film

The current mainstream price of 420g transparent EVA film is 6.26-6.47 yuan/square meter, the price of 420g white EVA film is 6.72-6.93 yuan/square meter, the price of 380g EPE film is 7.56-7.94 yuan/square meter, and the price of 380g POE The price of film is 11.02-11.40 yuan/square meter. It is expected that there will be no price changes until the Chinese New Year.

Supply and Demand: PV film

The January production of films has ended. Except for some remaining orders to be delivered, the production process has basically been completed. Production in January was mainly for EPE and highly transparent EVA.

Inverters

Price

This week, the price of 20 kw grid-connected inverters was 0.15-0.19 yuan/W, the price of 50kw was 0.14-0.18 yuan/W, and the price of 110kw was 0.12-0.17 yuan/W.

Supply and Demand

There is no overall change in the inverter price range, and prices remain stable. Domestic procurement demand has been weak recently, and terminals are still in a mood to lower prices. As the Chinese New Year approaches, production holidays are also starting one after another. We will wait and see how demand recovers after the holidays.

PV glass

Price

3.2mm single-layer coated glass: The price of 3.2mm single-layer coated photovoltaic glass is 25.8-26.5 yuan/square meter, and the price remains stable.

3.2mm double-layer coated glass: 3.2mm single-layer coated photovoltaic glass is quoted at 26.8-27.5 yuan/square meter, and the price remains stable.

2.0mm single-layer coated glass: The price of 2.0mm single-layer coated photovoltaic glass is 16.3-17.0 yuan/square meter, and the price remains stable.

2.0mm double-layer coated glass: 2.0mm single-layer coated photovoltaic glass is quoted at 17.3-18.0 yuan/square meter, and the price remains stable.

Supply

So far in January, two kilns have been repaired in Anhui and two kilns in Jiangsu, with a production capacity of 2,900t/d.

Demand

This week orders for photovoltaic glass in February were signed. The current price has not been announced yet. However, due to weak component demand and weakening cost support, glass prices have mainly fallen, with a decrease of about 0.5 yuan/square meter.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
PV 프레임 가동률 안정적, 기대 약화; 알루미늄 잉곳 재고 감소 가속, 알루미늄 가격 중심 상승 [SMM 분석]
12시간 전
PV 프레임 가동률 안정적, 기대 약화; 알루미늄 잉곳 재고 감소 가속, 알루미늄 가격 중심 상승 [SMM 분석]
더 보기
PV 프레임 가동률 안정적, 기대 약화; 알루미늄 잉곳 재고 감소 가속, 알루미늄 가격 중심 상승 [SMM 분석]
PV 프레임 가동률 안정적, 기대 약화; 알루미늄 잉곳 재고 감소 가속, 알루미늄 가격 중심 상승 [SMM 분석]
12시간 전
[SMM PV 플래시]
14시간 전
[SMM PV 플래시]
더 보기
[SMM PV 플래시]
[SMM PV 플래시]
한 선도 석유화학 공장이 어제 한 생산 재개 라인을 중단했고, 오늘 다른 라인에서 LDPE 생산을 시작했다. 단기적으로 이 기업의 생산 일정은 고압 소재 라인 1개와 PV 소재 라인 1개의 병행 생산을 유지할 것이다. 이번 라인 조정 이후 해당 공장의 PV 소재 생산 규모는 다소 축소되었다.
14시간 전
[SMM PV 뉴스] 화넝 산시 선무 100MW 태양광 프로젝트 전용량 계통 연계 달성
14시간 전
[SMM PV 뉴스] 화넝 산시 선무 100MW 태양광 프로젝트 전용량 계통 연계 달성
더 보기
[SMM PV 뉴스] 화넝 산시 선무 100MW 태양광 프로젝트 전용량 계통 연계 달성
[SMM PV 뉴스] 화넝 산시 선무 100MW 태양광 프로젝트 전용량 계통 연계 달성
2026년 8월 31일, 화넝 산시 션무 10만 kW 태양광(PV) 발전 프로젝트가 전 용량 계통 연계를 달성했으며, 이는 화넝 산시 신에너지 지사의 누적 설비용량이 300만 kW를 넘어섰음을 의미한다. 션무 프로젝트 착수 이후, 산시 북부의 잦은 강풍·모래먼지 날씨, 복잡한 지형·지세, 제한된 시공 여건, 촉박한 공기 등 여러 도전에 직면한 가운데 모든 건설 인력이 힘을 모아 난관을 극복하고 우수성을 추구했다. 안전생산과 품질관리 요구사항을 엄격히 이행하고, 시공 계획을 과학적으로 조율했으며, 시공 공정 흐름을 최적화해 승압변전소 건설, 태양광 패널 지지대 설치, 모듈 포설, 집전선로 설치, 설비 디버깅 및 교정 등 핵심 업무를 질서 있게 추진했다. 정밀 관리, 표준화 시공, 상시적 문제 해결을 통해 시공 과정의 각종 어려움과 병목을 효율적으로 해소하고 공정 추진을 안정적으로 가속화했으며, 최초 계통 연계부터 전 용량 계통 연계까지의 완벽한 마무리를 성공적으로 달성해 화넝의 속도, 화넝의 책임, 화넝의 품질을 충분히 입증했다
14시간 전
Domestic PV-grade EVA granule prices continue to rise, photovoltaic glass new order prices to fall - Shanghai Metals Market (SMM)