SMM Survey of Infrastructure Enterprises in July

게시됨: Jul 27, 2023 16:51
출처: SMM
1. A medium-sized infrastructure enterprise in south China: The project is currently progressing as scheduled. We adjusted operations to avoid high temperatures and we were not affected. Payment collection is fast. Our project is a special fund project, and when the project was finalised, we had already received the fund. The production progress in August may be slower, but we can catch up on it in September and October. The progress would be close to that in the second quarter.

1. A medium-sized infrastructure enterprise in south China: The project is currently progressing as scheduled. We adjusted operations to avoid high temperatures and we were not affected. Payment collection is fast. Our project is a special fund project, and when the project was finalised, we had already received the fund. The production progress in August may be slower, but we can catch up on it in September and October. The progress would be close to that in the second quarter.

2. A large infrastructure company in north-west China: We have new projects this month due to the peak season now, and purchased in large volumes. But we have no inventory amid cash flow issues. Workers increased. There are no completed projects yet, and all of them are in progress. The project progress is normal.

3. A medium-sized infrastructure company in north China: The project in hand is progressing normally, and the construction progress slowed down affected by the weather. There are no new projects or completed projects this month, so our purchase volume is basically stable. The number of personnel is also relatively stable, but may be reduced if there are no more projects. In the next three months, there may be no new projects or completed projects. This year, the number of our projects fell sharply compared with last year. We are undergoing cash flow issues and payment collection is slow.

4. A medium-sized infrastructure company in south-west China: Our company has not changed much this year compared to last year. There are new projects and completed projects this month. We purchase on demand and do not prepare inventory. The construction speed slowed down due to high temperatures as production has been required to be halted when the temperature exceeds a certain degree. Payment collection is slow amid the downturn in the economy. But we do not have cash flow issues.

5. A large-scale infrastructure company in south-west China: The construction progress of their company is acceptable at present. There are dozens of new projects this month. We increased purchases and manpower. Our cash is sufficient this year.

More popular news:

Shenzhen Released 24 Measures To Support High-Quality Development Of Foreign Trade

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

SMM Daily Comments (Jul 3): SHFE Base Metals Rose across the Board with Tin Surging, Ferrous Metals Prices Closed Mixed

SMM Daily Comments (Jul 5): Base and Ferrous Metals Prices Mostly Fell, WTI Soared despite Lingering Concerns over Global Economic Downturn

SMM Daily Comments (Jul 6): SHFE, LME Base Metals Diverged with SHFE Nickel and Tin Skyrocketing, Ferrous Metals Rose across the Board

China Commodity Supply and Demand Boomed in June

China Vows To Increase Macro-Control Efforts, Expand Consumption And Stabilise Investment

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

Copper Inventories in China Bonded Zones Plunged This Week

SAIC: Car Sales in June Rose to Highest for The Year

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[SMM 건축자재 주간 수급] 시장 거래 분위기 개선, 실수요 회복은 기대에 못 미쳐
1시간 전
[SMM 건축자재 주간 수급] 시장 거래 분위기 개선, 실수요 회복은 기대에 못 미쳐
더 보기
[SMM 건축자재 주간 수급] 시장 거래 분위기 개선, 실수요 회복은 기대에 못 미쳐
[SMM 건축자재 주간 수급] 시장 거래 분위기 개선, 실수요 회복은 기대에 못 미쳐
SMM 통계에 따르면, 이번 기간 건자재의 공장 재고와 사회 재고가 모두 정도의 차이는 있으나 감소했습니다. 건자재 총재고는 807만 4,000톤으로, 전월 대비 11만 8,500톤 감소(전월 대비 -1.45%)했습니다.
1시간 전
[SMM 건자재 사회재고 대규모 샘플 조사] 가격 반등으로 재고 소진, 이번 주 건자재 사회재고 감소폭 소폭 확대
1시간 전
[SMM 건자재 사회재고 대규모 샘플 조사] 가격 반등으로 재고 소진, 이번 주 건자재 사회재고 감소폭 소폭 확대
더 보기
[SMM 건자재 사회재고 대규모 샘플 조사] 가격 반등으로 재고 소진, 이번 주 건자재 사회재고 감소폭 소폭 확대
[SMM 건자재 사회재고 대규모 샘플 조사] 가격 반등으로 재고 소진, 이번 주 건자재 사회재고 감소폭 소폭 확대
SMM 조사에 따르면, 이번 주 건축자재 총 사회 재고의 재고 소진 속도가 소폭 빨라졌다. 2026년 9월 3일 기준, SMM 건축자재 사회 재고는 545만 8천 톤으로 전주 대비 7만 8,900톤 감소해 1.43% 줄었다.
1시간 전
【석탄 가격 강세에 PTBA, 생산 목표 상향; 하반기 생산량 3010만 톤 달성해야 연간 계획 충족】
2시간 전
【석탄 가격 강세에 PTBA, 생산 목표 상향; 하반기 생산량 3010만 톤 달성해야 연간 계획 충족】
더 보기
【석탄 가격 강세에 PTBA, 생산 목표 상향; 하반기 생산량 3010만 톤 달성해야 연간 계획 충족】
【석탄 가격 강세에 PTBA, 생산 목표 상향; 하반기 생산량 3010만 톤 달성해야 연간 계획 충족】
인도네시아 국영 석탄 생산업체 PTBA가 2026년 생산 목표를 4,950만 톤에서 4,955만 톤으로 소폭 상향 조정했다. 연간 판매 목표는 4,951만 톤, 운송 목표는 4,100만 톤으로 설정했다. 생산 목표는 5만 톤, 약 0.1%만 늘어나 조정 자체가 시장 공급에 미치는 직접적 의미는 매우 제한적이다. 더 중요한 점은 PTBA의 상반기 생산량이 전년 동기 대비 10% 감소한 1,945만 톤에 그쳤다는 것이다. 연간 목표를 달성하려면 하반기에 약 3,010만 톤을 생산해야 하며, 이는 상반기 생산량보다 약 54.8% 많은 수준이다. 같은 기간 약 2,841만 톤을 판매해야 하는데, 이는 상반기 판매량보다 약 34.6% 많은 규모로 생산 회복이 충분한 운송 및 판매 역량으로 뒷받침되어야 함을 의미한다. PTBA의 2분기 생산량은 직전 분기 대비 94% 증가했고 판매량은 8% 늘어나 운영이 회복되기 시작했음을 보여주었다. 상반기 평균 판매가는 직전 분기 대비 14%, 전년 동기 대비 10% 상승해 매출은 8% 증가한 22조 300억 루피아를 기록했고, 모회사 귀속 순이익은 218% 급증한 2조 6,500억 루피아를 달성했다. 가격과 수익성 개선으로 생산 및 판매 확대 유인이 커졌다. PTBA의 상반기 내수 판매는 전년 동기 대비 9% 감소한 1,077만 톤이었고, 수출은 5% 증가한 1,033만 톤을 기록했다. 회사는 수출 판매도 강화할 계획이다.
2시간 전