It is understood that in April 2022, Jiangxi Pingxiang Economic and Technological Development Zone signed a contract with Chuangpusi. The company plans to build a 300,000-mt cathode and anode material production base. The first phase of the project will build a 60,000-mt LFP cathode material-based production line. The total investment is 7.5 billion yuan.
![[SMM 분석] 9월 국내 삼원계 양극재 생산 계획 대폭 축소](https://imgqn.smm.cn/usercenter/JMINH20251217171728.jpg)
![[전고체 배터리: 톈넝, 반고체 314Ah 배터리 셀 규모화 납품 달성, 다중 기술 체계에서 단계적 돌파구 마련]](https://imgqn.smm.cn/usercenter/JmyWy20251217171729.png)
