The environmental protection supervision becomes stricter and the assessment node of the 13th five-year Plan will pull up the relevant stocks and boost the environmental protection seal board of Zhongchuang.

게시됨: Sep 14, 2020 11:43 (GMT+8)
Today, the environmental protection project section rose rapidly. by the close of noon, the plate as a whole was up 3.91%. Among them, Zhongchuang Environmental Protection rose by the daily limit of 9.92 yuan per share by midday, while Science and Technology Environment, CLP Environmental Protection, Mengcao Ecology and China Construction Environmental Energy all rose by more than 10%.

SMM9 March 14: today, the environmental protection project section rose rapidly, as of midday closing, the overall plate rose 3.91%, of which, Zhongchuang Environmental Protection limit, as of noon closing at 9.92 yuan per share, science and technology environment, CLP environmental protection, Mengcao ecology, China Construction Environmental Energy have followed up, an increase of more than 10%.

Industry trends

In the first half of the year, the Ministry of Ecology and Environment issued the Circular on strengthening the quality Supervision of Environmental impact reports (tables), requiring all localities to take the Shenzhen Bay incident as a lesson to carry out special inspection of the quality of EIA documents. Recently, the Ministry of Ecology and Environment has transferred a number of clues to the serious quality problems of EIA documents found in supervision to the ecological and environmental departments of six provinces (regions), including Zhejiang, Jiangxi, Hunan, Guangdong, Guangxi, and Sichuan, requiring them to carry out investigation and evidence collection in accordance with the law. if the existing illegal acts are investigated and dealt with in accordance with the law, and if they are suspected of committing crimes, they will also be transferred to judicial organs for criminal responsibility, thus continuing the supervision situation with quality as the core. It has strengthened the deterrence and warning of illegal acts such as fraud in the environmental assessment.

The Ministry of Ecology and Environment also issued the Circular on strengthening Law Enforcement in the clearance and rectification of fixed pollution sources permits and the Registration of pollution discharge permits, further standardizing the ways and contents of law enforcement inspection in the clean-up and rectification of fixed pollution sources and license registration. Since the beginning of this year, spot checks have been carried out on the quality of clean-up and rectification work, involving more than 700,000 pollutant discharge units, inspecting the submission of implementation reports submitted by 156200 licensed units before 2019, and urging them to submit annual and quarterly implementation reports on time.

On September 9, the Ministry of Ecology and Environment held a national conference on environmental management of hazardous waste and a three-year action promotion meeting for the special regulation of hazardous waste, to implement the New waste consolidation Law, and to strengthen environmental supervision of hazardous waste. we will promote three-year actions and special law enforcement actions for the special regulation of hazardous wastes. The stricter supervision of hazardous wastes will speed up the visualization of the actual demand for hazardous wastes and further enhance the prosperity of the hazardous waste sector. for a long time, there has been a phenomenon of concealment in departmental enterprises, resulting in a far smaller amount of hazardous waste disposal than the actual production, which usually increased sharply in the year of stricter supervision. the impact of policies and supervision is significant, promoting the high prosperity of the hazardous waste sector.

In order to further strengthen the supervision of EIA and pollutant discharge permits and promote the institutionalization and normalization of supervision, the Ministry of Ecological Environment recently issued the Action Plan for the Supervision of Environmental Assessment and sewage discharge permits (2021-2023). Ecological and environmental departments at all levels are required to attach great importance to and conscientiously deploy, formulate and organize the implementation of their own administrative regional supervision action plan and 2021 work plan.

The Action Plan requires that ecological and environmental departments at all levels should focus on outstanding problems in key areas and industries, and focus on illegal acts that affect the effectiveness of source prevention of the EIA system, affect the full coverage of permits for pollution discharge from fixed sources, and are reflected by the masses in a concentrated manner, strictly investigate and deal with them in accordance with the law, severely crack down on and curb fraud, shoddy manufacturing, failure to implement EIA requirements, discharge without license, discharge without license, and other illegal acts. All localities shall formulate an action plan for supervision of their respective administrative regions from 2021 to 2023 and formulate and implement annual work plans on an annual basis. Ecological and environmental departments at all levels should carry out supervision around the two aspects of "quality" and "implementation". For the environmental impact assessment of construction projects, carry out random checks on the review of environmental assessment documents, the implementation of environmental assessment documents and approval requirements, and carry out random checks on the legal compliance of environmental impact assessment projects in the environmental impact registration form; in view of planning environmental impact assessment, carry out spot checks on the implementation of planning environmental impact statements in key areas; for pollution discharge permits, carry out random checks on the issuance, registration and implementation of pollution discharge permits.

In March this year, the Ministry of Ecology and Environment reported on the comprehensive treatment of medical waste that medical waste treatment in 22 cities across the country was overloaded, while 28 cities were operating at full load or close to full load, and the medical waste treatment system was facing a test. it is urgent to make up for the deficiency of medical waste treatment capacity. Following the announcement in August this year of investment in the central budget to support the building of national capacity for medical waste disposal, the National Development and Reform Commission recently announced that it would allocate another 2.68 billion yuan in the central budget. Since the beginning of the year, the National Development and Reform Commission has invested a total of 4.5 billion yuan in projects such as supporting emergency standby capacity building for medical waste disposal, improving and expanding medical waste disposal capacity, as well as capacity building for medical waste collection and transportation.

As of September 10, the second round of central eco-environmental protection inspectors had held 21 party and government leading cadres accountable.

Guosheng Securities pointed out that since 2019, interest rates have fallen, state-owned assets have taken ownership, and debt financing of environmental protection enterprises has improved significantly, while new refinancing rules have been introduced to solve the difficulties of enterprise equity financing, eliminating the most important factor in suppressing PE. In addition, this year is the last year of the 13th five-year Plan, there are expected to be more new environmental protection projects under the assessment node, and the attribute of environmental protection investment is expected to be reflected in the downward period of economic growth.

"Click to sign up: 2020 Fifth China Electrotechnical Materials supply and demand Trade Summit

Scan the code to participate in the meeting or apply to join the SMM Electrical Industry Exchange Group

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
인도, 금·은·백금 수입에 대한 3% IGST 면제 종료로 수입업체 자금 조달 수요 증가
5시간 전
인도, 금·은·백금 수입에 대한 3% IGST 면제 종료로 수입업체 자금 조달 수요 증가
더 보기
인도, 금·은·백금 수입에 대한 3% IGST 면제 종료로 수입업체 자금 조달 수요 증가
인도, 금·은·백금 수입에 대한 3% IGST 면제 종료로 수입업체 자금 조달 수요 증가
[SMM 귀금속 익스프레스] 인도 정부는 은행 및 지정 기관이 금, 은, 백금 수입 시 더 이상 3% IGST 면제 혜택을 받지 못함을 확인했다. 이번 변경은 영구적인 추가 세금 부담을 부과하는 것은 아니지만, 수입 시 세금을 선납해야 하므로 수입업체의 단기 자금 조달 필요성과 운전자본 요구 사항이 증가한다. 해당 면제는 3월 31일 만료 후 갱신되지 않았으며, 일부 수입업체는 최근 몇 달간 이미 해당 세금을 납부해 왔다. 인도의 금 소비 성수기가 10월 중순부터 시작됨에 따라 수입업체의 자금 압박은 더욱 커질 전망이다.
5시간 전
가나, 주요 아산코 광산 임대권 2040년대까지 연장
14시간 전
가나, 주요 아산코 광산 임대권 2040년대까지 연장
더 보기
가나, 주요 아산코 광산 임대권 2040년대까지 연장
가나, 주요 아산코 광산 임대권 2040년대까지 연장
[SMM GOold] 갈리아노 골드는 10월 8일 가나에서 운영 중인 아산코 금광의 광구 두 곳에 대한 임대 기간 연장을 확보했다고 발표했다. 아비렘 광구는 2041년까지 15년, 미라다니 광구는 2043년까지 17년 연장됐다. 이들 광구는 은크란, 아두비아소, 미라다니 노스 광체와 연간 580만 톤 처리 규모의 선광 공장, 관련 인프라, 은크란 컷 3을 포함한다. 이번 임대 연장 완료로 아산코의 현 장기 계획에 핵심적인 인프라와 광체에 대한 광권 불확실성이 줄어들었다. 다만 이 자체로 금 매장량, 생산량 또는 광산 수명이 늘어나는 것은 아니다. 갈리아노는 이번 승인이 지속적인 투자와 잠재적 매장량 증가의 기반을 제공한다고 밝혔으며, 추가 온스나 운영 연한을 확보하려면 여전히 시추, 기술 연구 및 매장량 공시가 뒷받침되어야 한다고 덧붙였다.
14시간 전
선물·주식 동반 상승, 귀금속 섹터 급등, 웨스턴 골드 상한가, 현물 은 거래 소폭 개선 [SMM 속보]
18시간 전
선물·주식 동반 상승, 귀금속 섹터 급등, 웨스턴 골드 상한가, 현물 은 거래 소폭 개선 [SMM 속보]
더 보기
선물·주식 동반 상승, 귀금속 섹터 급등, 웨스턴 골드 상한가, 현물 은 거래 소폭 개선 [SMM 속보]
선물·주식 동반 상승, 귀금속 섹터 급등, 웨스턴 골드 상한가, 현물 은 거래 소폭 개선 [SMM 속보]
18시간 전