SMM Evening Comments (Jul 1)

게시됨: Jul 1, 2019 18:08
SHFE nonferrous metals closed mixed

SHANGHAI, Jul 1 (SMM) – SHFE nonferrous metals closed mixed on the first trading day of July as investors reassessed US-China trade talks and amid disappointing factory data from China, the world’s top consumer of many metals.

Lead saw the biggest gain of 1.5%, copper rose 0.8% and zinc nudged up 0.03% while aluminium fell 0.6%, tin declined 0.8% and nickel dropped 2.1%.

The ferrous complex, however, ticked up across the board. Iron ore jumped 4.7%, coke advanced 3.2%, rebar rose 1.6%, hot-rolled coil gained 1.3% and coking coal increased by 1.1%.

Oil prices received a boost after Russian President Vladimir Putin announced over the weekend that Russia reached an agreement with Saudi Arabia to extend the oil output deal by six to nine months.

Copper: The most active SHFE August contract jumped to a high of 47,420 yuan/mt shortly after this morning’s opening bell, and traded rangebound in the rest trading hours to close the trading day 0.77% higher at 47,360 yuan/mt. Despite support from the latest developments in US-China trade talks and OPEC-led production cuts as well as technical indicators, copper prices face headwinds from an increase of 8,000 mt in Guangdong stocks. SHFE copper is expected to find some cues from its LME counterpart tonight, and try to hold onto its ground above 47,200 yuan/mt.

Aluminium: The most traded SHFE August contract reversed its initial, moderate gains to a 3.5-month low of 13,720 yuan/mt after SMM data showed a smaller decline in social inventories of primary aluminium ingots in China over the weekend. This grew concerns about consumption in a low season in the third quarter. The contract closed 0.58% lower at 13,750 yuan/mt, below all short-term moving averages. It is expected to remain weak and rangebound tonight, awaiting more cues around consumption.

Zinc: The most active SHFE August contract followed its LME counterpart higher in early morning trade, to an intraday high of 20,095 yuan/mt before it gave up most of the gains to close at 19,860 yuan/mt. The unwinding of short positions accounted for today’s gains, suggesting limited upward momentum in SHFE zinc. With continued weakness in fundamentals, strength at the 20-day moving average will come under scrutiny tonight.

Nickel: As longs trimmed their positions, the most traded SHFE August contact dropped after moderately rising to a high of 102,330 yuan/mt, losing more than 2% on the day to end at 99,670 yuan/mt. This snapped a four-day winning streak. Strength at the 10-day moving average and 99,000 yuan/mt is under scrutiny tonight.

Lead: The most active SHFE August contract climbed during the day, shrugging off resistance from the 60-day moving average to close at a high of 16,275 yuan/mt, up 1.53% on the trading day. We see limited further upside in SHFE lead, as short-covering primarily accounted for today’s gains and given strong resistance from the 16,300 yuan/mt level. The contract is expected to try to remain above the 60-day moving average tonight.

Tin: The most traded SHFE September contract traded rangebound during the day, failing to recover from Friday night’s losses to close 0.81% lower at 142,300 yuan/mt. The load-up of short positions primarily accounted for today’s losses. Support is seen at 141,500 yuan/mt.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[SMM 귀금속 익스프레스]
4시간 전
[SMM 귀금속 익스프레스]
더 보기
[SMM 귀금속 익스프레스]
[SMM 귀금속 익스프레스]
임플랏츠는 워터버그 PGM 프로젝트의 전략적 가치를 재평가하고 있다. 회사 경영진은 최근 규모 축소와 자본 비용 최적화를 거친 수정된 워터버그 계획이 이전 버전보다 매력적이며, 이 프로젝트가 그룹의 미래 성장 파이프라인에 다시 편입되었다고 밝혔다. 이러한 변화는 남아프리카공화국 PGM 산업이 직면한 현실을 반영하기도 한다. 낮은 위험과 합리적인 자본 집약도로 추가 생산량을 확보할 수 있는 프로젝트가 점점 희소해지고 있는 것이다.
4시간 전
[SMM 귀금속 익스프레스]
4시간 전
[SMM 귀금속 익스프레스]
더 보기
[SMM 귀금속 익스프레스]
[SMM 귀금속 익스프레스]
남아프리카공화국의 대규모 그린수소 프로젝트가 또 한 번 중요한 진전을 이루었다. 하이브 하이드로젠 남아프리카는 9월 15일 약 58억 달러 규모의 그린수소·그린암모니아 프로젝트에 대한 기본설계(FEED) 계약을 스페인 엔지니어링 기업 테크니카스 레우니다스에 정식 발주했다고 발표했다. 현재 개발 후반 단계에 있는 이 프로젝트는 남아프리카공화국의 대표적인 그린수소 사업이자 유럽연합 글로벌 게이트웨이 프로그램의 핵심 시범 프로젝트 중 하나로 평가받고 있다.
4시간 전
[SMM 귀금속 익스프레스]
4시간 전
[SMM 귀금속 익스프레스]
더 보기
[SMM 귀금속 익스프레스]
[SMM 귀금속 익스프레스]
발테라 플래티넘은 남아프리카 림포포에 위치한 모갈라퀘나 PGM 광산이 매우 방대한 장기 자원 기반을 보유하고 있다고 밝혔다. 광산 운영 총괄 책임자는 밸류체인 미디어 브리핑에서 모갈라퀘나가 4원소(4E) 기준 약 2억 8,500만 온스의 자원을 보유하고 있다고 언급했다. 회사가 현재 계획 중인 6원소(6E) 연간 생산 목표 90만~100만 온스를 기준으로 할 때, 이 광산의 잠재적 자원 수명은 300년을 초과할 수 있다.
4시간 전