SMM Evening Comments (Jun 18)

게시됨: Jun 18, 2019 17:30
SHFE nonferrous metals extended their declines for the most part

SHANGHAI, Jun 18 (SMM) – SHFE nonferrous metals extended their declines for the most part on Tuesday June 18 with nickel leading the losses and ending 1.06% lower. Tin fell 0.72%, zinc lost 0.18%, aluminium dropped 0.11%, while copper gained 0.37%, and lead rose 0.34%. 

The ferrous complex mostly rebounded as iron ore jumped 2.14%, rebar expanded 0.27%, coking coal advanced 0.22%, hot-rolled coil rose 0.19%, while coke slid 1.58%. 

Copper: The most-liquid SHFE August contract traded rangebound with pressure from the 10-day moving average, as the market awaited results of the US Federal Reserve's interest rate meeting. It rebounded from a low of 46,220 yuan/mt near closing, and ended the trading day 0.37% higher at 46,330 yuan/mt. As the MACD red line lengthened, technical support is expected to keep the contract testing the 46,330 yuan/mt level tonight. 

Aluminium: The most-traded SHFE August contract moved away from the five-day moving average as pressure from shorts lowered it below the daily moving average to an intraday low of 13,780 yuan/mt. It lost 0.11% on the day and finished at 13,810 yuan/mt, with open interests up 7,190 lots to 255,000 lots. Fundamentals may continue to keep the contract weak tonight. 

Zinc: The most-active SHFE August contact stemmed decline at around 19,880 yuan/mt and rebounded a little to close at 19,930 yuan/mt, down 0.18% on the day. Shorts exited near closing, but expanding inventories of refined zinc provided limited confidence in longs. This, together with technical pressure above, is likely to cap any upward momentum in the contract tonight. Support from the Bollinger lower band will remain tonight. 

Nickel: Support from the Bollinger middle band prevented the most-active SHFE August contract from falling below the 97,700 yuan/mt level, after it slid below the daily moving average in the afternoon session. It lost 1.06% on the day and closed at 98,180 yuan/mt, with open interests up 1,000 lots to 231,000 lots. We see it testing support from the 20-day moving average, or the 98,000 yuan/mt level tonight. 

Lead: The most-liquid SHFE July contract continued to trade between the 20- and 40-day moving averages, as shorts accumulated at highs and bolstered the contract to 16,140 yuan/mt at closing, up 0.34% on the day. Tonight, it is expected to extend the rangebound trend along with the 10-day moving average. 

Tin: A lower LME tin grew pessimism in the market, and extended the decline in the most-traded SHFE September contract from overnight. The contract fell 0.72% on the day and ended at 143,640 yuan/mt, with open interests expanding 444 lots to 41,514 lots as shorts entered. Tonight, it is expected to test support from 143,000 yuan/mt if it fails to receive the current support from 143,500 yuan/mt. Pressure above is seen from the 10- and 20-day moving averages, or the 144,500 yuan/mt level tonight. 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
모로코 부마딘 다금속 광산의 경제성 개선
16시간 전
모로코 부마딘 다금속 광산의 경제성 개선
더 보기
모로코 부마딘 다금속 광산의 경제성 개선
모로코 부마딘 다금속 광산의 경제성 개선
16시간 전
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
19시간 전
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
더 보기
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
[SMM 속보] Greenland Mines는 동그린란드의 Skaergaard 팔라듐-백금-금 프로젝트에서 7개 지점에 걸쳐 104.8톤 규모의 벌크 샘플링 프로그램을 완료했다. 샘플은 핀란드 GTK Mintec에서 대규모 및 파일럿 규모의 제련 시험을 위해 준비 중이며, 회사는 프로젝트 기술 평가 진전을 목표로 엔지니어링, 가공, 인프라 및 폐기물 관리 연구를 계속하고 있다. Greenland Mines에 따르면 Skaergaard의 S-K 1300 자원량은 현재 약 1,500만 온스 PdEq 확정 자원량과 1,749만 온스 PdEq 추정 자원량으로 구성되어 있다. 벌크 테스트 프로그램은 남아프리카, 짐바브웨, 러시아 주요 공급 지역 외곽의 대규모 미개발 팔라듐-백금-금 시스템 중 하나에 대한 가공 및 회수 옵션을 평가하는 중요한 단계다. 다만 보고된 광물자원량은 광물매장량이 아니며, 이번 프로그램은 개발 또는 상업적 생산 결정을 의미하지 않는다.
19시간 전
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
19시간 전
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
더 보기
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
[SMM Flash] 아프리칸 레인보우 미네랄스와 임팔라 플래티넘의 남아프리카 PGM 합작법인인 투 리버스가 부시벨트 콤플렉스 동부 지역의 메렌스키 프로젝트에 대한 기술 검증 작업을 진행 중이다. FY2026 기간 중 프로젝트의 향후 방향을 결정하는 데 필요한 연구를 완료하기 위해 초기 작업 자본이 승인되었다. 메렌스키 선광기는 2024년 12월까지 6개월 동안 시운전을 마쳤으나, 이후 어려운 PGM 시장 여건 속에서 관리·유지 상태로 전환되었다. 이 프로젝트의 자본 비용은 약 73억 랜드로 명시되어 있으며, 정상 상태에서 연간 약 182,000온스의 6E PGM과 함께 연간 약 1,600톤의 니켈, 1,300톤의 구리를 생산하도록 설계되었다. 따라서 재가동 시 기존 남아프리카 운영에서 상당한 추가 PGM 공급이 가능할 수 있다. 그러나 이 프로젝트는 여전히 기술 검증 단계에 있으며, 재가동 일정이나 생산 재개에 대한 최종 결정은 발표되지 않았다.
19시간 전