Recovering demand lifts operating rates across wire, cable producers in May

게시됨: Jun 3, 2019 15:23
Average operating rate across wire and cable producers rose 4.25 percentage points from Apr to stand at 92.06% in May

SHANGHAI, Jun 3 (SMM) – Chinese manufacturers of wires and cables stepped up their operations in May as demand improved, especially orders from offshore wind turbine, solar power, ultra-high voltage, high-voltage projects.

The latest SMM survey showed that the average operating rate across Chinese wire and cable producers rose 4.25 percentage points from April to stand at 92.06% in May, up 1.07 percentage points from May 2018.

Housing and subway construction grew demand for medium- and low-voltage wires and cables last month, while the push for 5G networks construction bolstered demand for communication wires and cables.

Power investment, however, was disappointing, with the China Electricity Council reporting that realised investment in power grid projects in the first four months of 2019 dropped 19.1% year on year to stand at 80.3 billion yuan.

Producers told SMM that most of recent deliveries were for orders placed in the second half of last year. Demand from medium- and low-voltage power projects grew slowly this year.

Wire and cable demand flowed to large and medium-sized producers as buyers chased quality after the Xi’an Aokai scandal in March 2017. This led to the year-over-year increase in the operating rates across wire and cable producers in May, as most samples included in the SMM survey are large or medium-sized.

Excluding improved industrial concentration, operations across wire and cable producers were weaker than the same period last year.

The ratio of raw materials inventories to monthly output at Chinese wire and cable producers stood at 25.22% in May, up 2.58 percentage points from April, as greater orders and lower Shanghai copper prices drove producers to stockpile. Continued tightness in cash flows, however, kept them cautious about procurement.

The average operating rate across Chinese wire and cable producers is expected to inch down 0.12 percentage point month on month to 91.95% in June, up 8.51 percentage points year on year.

Poor year-to-date investment in power grid projects raised pessimism about consumption of wires and cables in the remainder of this year, even if investment substantially expands in the third quarter.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[SMM 귀금속 속보]
17시간 전
[SMM 귀금속 속보]
더 보기
[SMM 귀금속 속보]
[SMM 귀금속 속보]
호주 킹스로즈 마이닝은 9월 15일 핀란드 페니카트 백금족 원소 프로젝트 6구역에 대한 허가 절차가 진행 중이라고 밝혔다. 규제 승인과 이의 제기가 없을 경우, 회사는 2027년 1월에 시추를 시작하는 것을 목표로 하고 있다. 6구역의 탐사 목표는 평균 6E 품위 4~7.4g/t에 2,100만~3,200만 톤으로 제안되었다. 금속 구성은 백금, 팔라듐, 로듐, 이리듐, 루테늄, 금을 포함하며, 이는 약 280만~770만 온스의 6E 금속에 해당한다.
17시간 전
[SMM 귀금속 익스프레스]
18시간 전
[SMM 귀금속 익스프레스]
더 보기
[SMM 귀금속 익스프레스]
[SMM 귀금속 익스프레스]
캐나다의 신흥 구리·팔라듐 광산업체 제너레이션 마이닝이 캐나다 성장 펀드(CGF)로부터 약 1억 4천만 달러의 투자를 유치했다. 이 자금은 온타리오주 마라톤 구리-팔라듐 프로젝트의 최종 투자 결정 및 후속 건설 추진을 지원할 예정이다. 이번 투자는 캐나다 정부가 공적 자본을 활용해 민간 자금을 동원하고, 핵심 광물 프로젝트 개발을 가속화하며 북미의 핵심 금속 공급망을 강화하고 있음을 보여준다.
18시간 전
[SMM 귀금속 속보]
18시간 전
[SMM 귀금속 속보]
더 보기
[SMM 귀금속 속보]
[SMM 귀금속 속보]
호주 포디움 미네랄스는 9월 14일 미국 소재 PGM 프로세싱과 구속력 없는 양해각서를 체결했다고 발표했다. 이 계획은 서호주의 팍스 리프 프로젝트를 미국의 중간 및 하류 처리, 2차 재활용 역량과 연결하여 호주-미국 통합 PGM 공급망을 구축하는 것이다.
18시간 전