Milpo to Release New Resource Assessment for Shalipayco Zinc Mine in Early 2018

๊ฒŒ์‹œ๋จ: Jun 9, 2017 13:14
The budget for Shalipayco projectโ€™s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

SHANGHAI, Jun. 9 (SMM) - The budget for Shalipayco project’s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

China Refined Zinc Output Posts Remarkable Decline in May, SMM Reports

Shalipayco is a zinc mine project. Preliminary research has been done during 2008-2014, and drilling length reached 91,000 meters. Milpo estimated zinc reserves with grade above 5% were about 20 million tonnes.

The Shalipayco project is located 170 kilometers in the northeast of Lima. The mine is also associated with lead and silver resources. It covers 21,000 hectares.

SMM Analysis: Is SHFE Zinc Facing Rising Short Squeeze Risk before Delivery?

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

๋ฐ์ดํ„ฐ ์ถœ์ฒ˜ ์„ค๋ช…: ๊ณต๊ฐœ ์ •๋ณด๋ฅผ ์ œ์™ธํ•œ ๋ชจ๋“  ๋ฐ์ดํ„ฐ๋Š” SMM์ด ๊ณต๊ฐœ ์ •๋ณด, ์‹œ์žฅ ์ปค๋ฎค๋‹ˆ์ผ€์ด์…˜ ๋ฐ SMM ๋‚ด๋ถ€ ๋ฐ์ดํ„ฐ๋ฒ ์ด์Šค ๋ชจ๋ธ์„ ๊ธฐ๋ฐ˜์œผ๋กœ ๊ฐ€๊ณตํ•œ ๊ฒƒ์ž…๋‹ˆ๋‹ค. ๋ณธ ์ž๋ฃŒ๋Š” ์ฐธ๊ณ ์šฉ์ด๋ฉฐ ์˜์‚ฌ๊ฒฐ์ • ๊ถŒ๊ณ ๋ฅผ ๊ตฌ์„ฑํ•˜์ง€ ์•Š์Šต๋‹ˆ๋‹ค.

๋ฌธ์˜ ์‚ฌํ•ญ์ด ์žˆ๊ฑฐ๋‚˜ ์ž์„ธํ•œ ์ •๋ณด๋ฅผ ์›ํ•˜์‹œ๋ฉด ์•„๋ž˜๋กœ ์—ฐ๋ฝํ•ด ์ฃผ์‹œ๊ธฐ ๋ฐ”๋ž๋‹ˆ๋‹ค: lemonzhao@smm.cn
๋ฆฌ์„œ์น˜ ๋ณด๊ณ ์„œ ์—ด๋žŒ ๋ฐฉ๋ฒ•์— ๋Œ€ํ•œ ์ž์„ธํ•œ ๋‚ด์šฉ์€ ์•„๋ž˜๋กœ ๋ฌธ์˜ํ•˜์‹œ๊ธฐ ๋ฐ”๋ž๋‹ˆ๋‹ค:service.en@smm.cn
๊ด€๋ จ ๋‰ด์Šค
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
2์‹œ๊ฐ„ ์ „
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
๋” ๋ณด๊ธฐ
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australiaโ€™s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authoritiesโ€™ determination.
2์‹œ๊ฐ„ ์ „
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
2์‹œ๊ฐ„ ์ „
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
๋” ๋ณด๊ธฐ
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
Market offers from ore traders remained limited this week, while winter stocking demand persisted. Some Chinese smelters continued to inquire about and procure imported concentrates for Q4, with market treatment charges remaining at low levels.
2์‹œ๊ฐ„ ์ „
์ค‘๊ตญ ๋ถ์„œ๋ถ€ ์•„์—ฐ ๊ด‘์‚ฐ, 9์›” ์ž…์ฐฐ๊ฐ€ -2,800์œ„์•ˆ/ํ†ค ์ œ์‹œ; SMM, ์ œ๋ จ์ˆ˜์ˆ˜๋ฃŒ ์ถ”์  ์˜ˆ์ •
2์‹œ๊ฐ„ ์ „
์ค‘๊ตญ ๋ถ์„œ๋ถ€ ์•„์—ฐ ๊ด‘์‚ฐ, 9์›” ์ž…์ฐฐ๊ฐ€ -2,800์œ„์•ˆ/ํ†ค ์ œ์‹œ; SMM, ์ œ๋ จ์ˆ˜์ˆ˜๋ฃŒ ์ถ”์  ์˜ˆ์ •
๋” ๋ณด๊ธฐ
์ค‘๊ตญ ๋ถ์„œ๋ถ€ ์•„์—ฐ ๊ด‘์‚ฐ, 9์›” ์ž…์ฐฐ๊ฐ€ -2,800์œ„์•ˆ/ํ†ค ์ œ์‹œ; SMM, ์ œ๋ จ์ˆ˜์ˆ˜๋ฃŒ ์ถ”์  ์˜ˆ์ •
์ค‘๊ตญ ๋ถ์„œ๋ถ€ ์•„์—ฐ ๊ด‘์‚ฐ, 9์›” ์ž…์ฐฐ๊ฐ€ -2,800์œ„์•ˆ/ํ†ค ์ œ์‹œ; SMM, ์ œ๋ จ์ˆ˜์ˆ˜๋ฃŒ ์ถ”์  ์˜ˆ์ •
SMM์— ๋”ฐ๋ฅด๋ฉด, ์ค‘๊ตญ ์„œ๋ถ๋ถ€์˜ ํ•œ ์•„์—ฐ ๊ด‘์‚ฐ์ด ์ด๋ฒˆ ์ฃผ 9์›” ์ž๊ฐ€ ์šด์†ก ์ž…์ฐฐ ๊ฐ€๊ฒฉ์œผ๋กœ ๊ธˆ์† ํ†ค๋‹น ์•ฝ -2,800์œ„์•ˆ์„ ์ œ์‹œํ–ˆ๋‹ค. SMM์€ ์ œ๋ จ ์ˆ˜์ˆ˜๋ฃŒ ๋ณ€๋™์„ ์ง€์†์ ์œผ๋กœ ๋ชจ๋‹ˆํ„ฐ๋งํ•  ์˜ˆ์ •์ด๋‹ค.
2์‹œ๊ฐ„ ์ „